Author Question: In the ________ phase of the traditional SDLC, the functional requirements have to be converted to ... (Read 102 times)

luvbio

  • Hero Member
  • *****
  • Posts: 623
In the ________ phase of the traditional SDLC, the functional requirements have to be converted to system and process flow charts, user input screens, sample reports, etc.
 
  A) maintenance
  B) design
  C) implementation
  D) analysis
  E) investigation

Question 2

An associative entity joins two entities.
 
  Indicate whether the statement is true or false



vickyvicksss

  • Sr. Member
  • ****
  • Posts: 351
Answer to Question 1

B

Answer to Question 2

TRUE



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The Romans did not use numerals to indicate fractions but instead used words to indicate parts of a whole.

Did you know?

Chronic marijuana use can damage the white blood cells and reduce the immune system's ability to respond to disease by as much as 40%. Without a strong immune system, the body is vulnerable to all kinds of degenerative and infectious diseases.

Did you know?

The first oncogene was discovered in 1970 and was termed SRC (pronounced "SARK").

Did you know?

Hypertension is a silent killer because it is deadly and has no significant early symptoms. The danger from hypertension is the extra load on the heart, which can lead to hypertensive heart disease and kidney damage. This occurs without any major symptoms until the high blood pressure becomes extreme. Regular blood pressure checks are an important method of catching hypertension before it can kill you.

Did you know?

Prostaglandins were first isolated from human semen in Sweden in the 1930s. They were so named because the researcher thought that they came from the prostate gland. In fact, prostaglandins exist and are synthesized in almost every cell of the body.

For a complete list of videos, visit our video library