Author Question: What are sources to use to calculate a single loss expectancy as part of a risk assessment? A) ... (Read 55 times)

tingc95

  • Hero Member
  • *****
  • Posts: 556
What are sources to use to calculate a single loss expectancy as part of a risk assessment?
 
  A) historical experiences of the organization
  B) industry averages
  C) recent incidents only (typically the past 6 months)
  D) both A and B

Question 2

Sales modules have to be closely integrated with the organization's network module.
 
  Indicate whether the statement is true or false



asdfasdf

  • Sr. Member
  • ****
  • Posts: 339
Answer to Question 1

D

Answer to Question 2

FALSE



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

In the ancient and medieval periods, dysentery killed about ? of all babies before they reach 12 months of age. The disease was transferred through contaminated drinking water, because there was no way to adequately dispose of sewage, which contaminated the water.

Did you know?

Between 1999 and 2012, American adults with high total cholesterol decreased from 18.3% to 12.9%

Did you know?

Stevens-Johnson syndrome and Toxic Epidermal Necrolysis syndrome are life-threatening reactions that can result in death. Complications include permanent blindness, dry-eye syndrome, lung damage, photophobia, asthma, chronic obstructive pulmonary disease, permanent loss of nail beds, scarring of mucous membranes, arthritis, and chronic fatigue syndrome. Many patients' pores scar shut, causing them to retain heat.

Did you know?

Cyanide works by making the human body unable to use oxygen.

Did you know?

Human neurons are so small that they require a microscope in order to be seen. However, some neurons can be up to 3 feet long, such as those that extend from the spinal cord to the toes.

For a complete list of videos, visit our video library