Author Question: Determine the number of times the sewer mains will need to be replaced by . (Hint: Divide the total ... (Read 91 times)

SAVANNAHHOOPER23

  • Hero Member
  • *****
  • Posts: 542

Determine the number of times the sewer mains will need to be replaced
  by . (Hint: Divide the total amount of predicted subsidence in
  (. meters) by . meters (the amount of subsidence that will require
  sewer main replacement).) What will be an ideal response?



Question 2

Determine the length of sewer mains that must be replaced each time the
  ground subsides . meters by multiplying the total length of sewer mains
  in the subsiding area (from question ) by  (.). Round your
  answer to the nearest whole number. What will be an ideal response?




nikmaaacs

  • Sr. Member
  • ****
  • Posts: 335
Answer to Question 1

1.5 m  0.3 m = 5 replacements

Answer to Question 2

157,766 x 0.80 = 126,213 m



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

Acetaminophen (Tylenol) in overdose can seriously damage the liver. It should never be taken by people who use alcohol heavily; it can result in severe liver damage and even a condition requiring a liver transplant.

Did you know?

There are approximately 3 million unintended pregnancies in the United States each year.

Did you know?

People with high total cholesterol have about two times the risk for heart disease as people with ideal levels.

Did you know?

About 100 new prescription or over-the-counter drugs come into the U.S. market every year.

Did you know?

Carbamazepine can interfere with the results of home pregnancy tests. If you are taking carbamazepine, do not try to test for pregnancy at home.

For a complete list of videos, visit our video library