Author Question: Determine the number of times the sewer mains will need to be replaced by . (Hint: Divide the total ... (Read 93 times)

SAVANNAHHOOPER23

  • Hero Member
  • *****
  • Posts: 542

Determine the number of times the sewer mains will need to be replaced
  by . (Hint: Divide the total amount of predicted subsidence in
  (. meters) by . meters (the amount of subsidence that will require
  sewer main replacement).) What will be an ideal response?



Question 2

Determine the length of sewer mains that must be replaced each time the
  ground subsides . meters by multiplying the total length of sewer mains
  in the subsiding area (from question ) by  (.). Round your
  answer to the nearest whole number. What will be an ideal response?




nikmaaacs

  • Sr. Member
  • ****
  • Posts: 335
Answer to Question 1

1.5 m  0.3 m = 5 replacements

Answer to Question 2

157,766 x 0.80 = 126,213 m



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

The effects of organophosphate poisoning are referred to by using the abbreviations “SLUD” or “SLUDGE,” It stands for: salivation, lacrimation, urination, defecation, GI upset, and emesis.

Did you know?

Intradermal injections are somewhat difficult to correctly administer because the skin layers are so thin that it is easy to accidentally punch through to the deeper subcutaneous layer.

Did you know?

Lower drug doses for elderly patients should be used first, with titrations of the dose as tolerated to prevent unwanted drug-related pharmacodynamic effects.

Did you know?

The oldest recorded age was 122. Madame Jeanne Calment was born in France in 1875 and died in 1997. She was a vegetarian and loved olive oil, port wine, and chocolate.

Did you know?

Nearly 31 million adults in America have a total cholesterol level that is more than 240 mg per dL.

For a complete list of videos, visit our video library