Author Question: When installing an exposed grid ceiling system, the first component to be installed is the _____. ... (Read 57 times)

s.tung

  • Hero Member
  • *****
  • Posts: 577
When installing an exposed grid ceiling system, the first component to be installed is the _____.
 
  a. main runners
  b. hanger inserts and wires
  c. cross runners (tees)
  d. wall angle

Question 2

Standards for the safe use of lasers in construction are published in _____.
 
  a. OSHA Standard 1650.60
  b. OSHA Standard 1710.22
  c. OSHA Standard 1926.54
  d. OSHA Standard 2100.10



okolip

  • Sr. Member
  • ****
  • Posts: 362
Answer to Question 1

d

Answer to Question 2

c



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

To maintain good kidney function, you should drink at least 3 quarts of water daily. Water dilutes urine and helps prevent concentrations of salts and minerals that can lead to kidney stone formation. Chronic dehydration is a major contributor to the development of kidney stones.

Did you know?

Colchicine is a highly poisonous alkaloid originally extracted from a type of saffron plant that is used mainly to treat gout.

Did you know?

Women are 50% to 75% more likely than men to experience an adverse drug reaction.

Did you know?

The senior population grows every year. Seniors older than 65 years of age now comprise more than 13% of the total population. However, women outlive men. In the 85-and-over age group, there are only 45 men to every 100 women.

Did you know?

Drug-induced pharmacodynamic effects manifested in older adults include drug-induced renal toxicity, which can be a major factor when these adults are experiencing other kidney problems.

For a complete list of videos, visit our video library