Author Question: Before a panel is tilted up, workers install beam seats and _____. a. panel connectors b. ... (Read 78 times)

Mr. Wonderful

  • Hero Member
  • *****
  • Posts: 866
Before a panel is tilted up, workers install beam seats and _____.
 
  a. panel connectors
  b. welding plates
  c. joists
  d. shelf angles

Question 2

During panel lifting and bracing, only the erection team is allowed in the _____.
 
  a. danger zone
  b. boom swing arc
  c. controlled-access zone
  d. lifting perimeter



kardosa007

  • Sr. Member
  • ****
  • Posts: 300
Answer to Question 1

d

Answer to Question 2

c



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The most common treatment options for addiction include psychotherapy, support groups, and individual counseling.

Did you know?

As of mid-2016, 18.2 million people were receiving advanced retroviral therapy (ART) worldwide. This represents between 43–50% of the 34–39.8 million people living with HIV.

Did you know?

In 1885, the Lloyd Manufacturing Company of Albany, New York, promoted and sold "Cocaine Toothache Drops" at 15 cents per bottle! In 1914, the Harrison Narcotic Act brought the sale and distribution of this drug under federal control.

Did you know?

The Babylonians wrote numbers in a system that used 60 as the base value rather than the number 10. They did not have a symbol for "zero."

Did you know?

All adults should have their cholesterol levels checked once every 5 years. During 2009–2010, 69.4% of Americans age 20 and older reported having their cholesterol checked within the last five years.

For a complete list of videos, visit our video library