Author Question: Before a panel is tilted up, workers install beam seats and _____. a. panel connectors b. ... (Read 108 times)

Mr. Wonderful

  • Hero Member
  • *****
  • Posts: 866
Before a panel is tilted up, workers install beam seats and _____.
 
  a. panel connectors
  b. welding plates
  c. joists
  d. shelf angles

Question 2

During panel lifting and bracing, only the erection team is allowed in the _____.
 
  a. danger zone
  b. boom swing arc
  c. controlled-access zone
  d. lifting perimeter



kardosa007

  • Sr. Member
  • ****
  • Posts: 300
Answer to Question 1

d

Answer to Question 2

c



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Methicillin-resistant Staphylococcus aureus or MRSA was discovered in 1961 in the United Kingdom. It if often referred to as a superbug. MRSA infections cause more deaths in the United States every year than AIDS.

Methicilli ...
Did you know?

The familiar sounds of your heart are made by the heart's valves as they open and close.

Did you know?

When Gabriel Fahrenheit invented the first mercury thermometer, he called "zero degrees" the lowest temperature he was able to attain with a mixture of ice and salt. For the upper point of his scale, he used 96°, which he measured as normal human body temperature (we know it to be 98.6° today because of more accurate thermometers).

Did you know?

In 2006, a generic antinausea drug named ondansetron was approved. It is used to stop nausea and vomiting associated with surgery, chemotherapy, and radiation therapy.

Did you know?

The shortest mature adult human of whom there is independent evidence was Gul Mohammed in India. In 1990, he was measured in New Delhi and stood 22.5 inches tall.

For a complete list of videos, visit our video library