Before a panel is tilted up, workers install beam seats and _____.
 
  a. panel connectors
  b. welding plates
  c. joists
  d. shelf angles

Question 2

During panel lifting and bracing, only the erection team is allowed in the _____.
 
  a. danger zone
  b. boom swing arc
  c. controlled-access zone
  d. lifting perimeter



kardosa007

  • Sr. Member
  • ****
  • Posts: 300
Answer to Question 1

d

Answer to Question 2

c



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

In most climates, 8 to 10 glasses of water per day is recommended for adults. The best indicator for adequate fluid intake is frequent, clear urination.

Did you know?

If all the neurons in the human body were lined up, they would stretch more than 600 miles.

Did you know?

Earwax has antimicrobial properties that reduce the viability of bacteria and fungus in the human ear.

Did you know?

More than 30% of American adults, and about 12% of children utilize health care approaches that were developed outside of conventional medicine.

Did you know?

The strongest synthetic topical retinoid drug available, tazarotene, is used to treat sun-damaged skin, acne, and psoriasis.

For a complete list of videos, visit our video library