This topic contains a solution. Click here to go to the answer

Author Question: Instead of using time schedules to define equipment repairs and predict failures, PDM uses _____. ... (Read 36 times)

folubunmi

  • Hero Member
  • *****
  • Posts: 524
Instead of using time schedules to define equipment repairs and predict failures, PDM uses _____.
 
  a. cost
  b. testing
  c. engineering studies
  d. meetings

Question 2

In PM, plant assets and equipment are subject to _____.
 
  a. increased use
  b. decreased use
  c. long-term wear
  d. periodic inspection and maintenance



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

yuyiding

  • Sr. Member
  • ****
  • Posts: 357
Answer to Question 1

b

Answer to Question 2

d




folubunmi

  • Member
  • Posts: 524
Reply 2 on: Jul 24, 2018
Excellent


EAN94

  • Member
  • Posts: 307
Reply 3 on: Yesterday
Great answer, keep it coming :)

 

Did you know?

Elderly adults are at greatest risk of stroke and myocardial infarction and have the most to gain from prophylaxis. Patients ages 60 to 80 years with blood pressures above 160/90 mm Hg should benefit from antihypertensive treatment.

Did you know?

Patients who have been on total parenteral nutrition for more than a few days may need to have foods gradually reintroduced to give the digestive tract time to start working again.

Did you know?

In most climates, 8 to 10 glasses of water per day is recommended for adults. The best indicator for adequate fluid intake is frequent, clear urination.

Did you know?

Famous people who died from poisoning or drug overdose include, Adolf Hitler, Socrates, Juan Ponce de Leon, Marilyn Monroe, Judy Garland, and John Belushi.

Did you know?

Human neurons are so small that they require a microscope in order to be seen. However, some neurons can be up to 3 feet long, such as those that extend from the spinal cord to the toes.

For a complete list of videos, visit our video library