This topic contains a solution. Click here to go to the answer

Author Question: To transfer roof loads to the foundation, ceiling joists are usually installed _____. a. on a ... (Read 115 times)

Caiter2013

  • Hero Member
  • *****
  • Posts: 607
To transfer roof loads to the foundation, ceiling joists are usually installed _____.
 
  a. on a doubled top plate
  b. between pairs of wall studs
  c. directly over wall studs
  d. with metal anchor plates

Question 2

Which of the following building components keeps opposite walls from spreading apart?
 
  a. Trimmer studs
  b. Rafters
  c. Ceiling joists
  d. Purlins



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

b614102004

  • Sr. Member
  • ****
  • Posts: 320
Answer to Question 1

c

Answer to Question 2

c





 

Did you know?

In 2010, opiate painkllers, such as morphine, OxyContin®, and Vicodin®, were tied to almost 60% of drug overdose deaths.

Did you know?

Human stomach acid is strong enough to dissolve small pieces of metal such as razor blades or staples.

Did you know?

ACTH levels are normally highest in the early morning (between 6 and 8 A.M.) and lowest in the evening (between 6 and 11 P.M.). Therefore, a doctor who suspects abnormal levels looks for low ACTH in the morning and high ACTH in the evening.

Did you know?

When blood is exposed to air, it clots. Heparin allows the blood to come in direct contact with air without clotting.

Did you know?

Nearly all drugs pass into human breast milk. How often a drug is taken influences the amount of drug that will pass into the milk. Medications taken 30 to 60 minutes before breastfeeding are likely to be at peak blood levels when the baby is nursing.

For a complete list of videos, visit our video library