This topic contains a solution. Click here to go to the answer

Author Question: To transfer roof loads to the foundation, ceiling joists are usually installed _____. a. on a ... (Read 116 times)

Caiter2013

  • Hero Member
  • *****
  • Posts: 607
To transfer roof loads to the foundation, ceiling joists are usually installed _____.
 
  a. on a doubled top plate
  b. between pairs of wall studs
  c. directly over wall studs
  d. with metal anchor plates

Question 2

Which of the following building components keeps opposite walls from spreading apart?
 
  a. Trimmer studs
  b. Rafters
  c. Ceiling joists
  d. Purlins



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

b614102004

  • Sr. Member
  • ****
  • Posts: 320
Answer to Question 1

c

Answer to Question 2

c





 

Did you know?

Patients who have been on total parenteral nutrition for more than a few days may need to have foods gradually reintroduced to give the digestive tract time to start working again.

Did you know?

Anesthesia awareness is a potentially disturbing adverse effect wherein patients who have been paralyzed with muscle relaxants may awaken. They may be aware of their surroundings but unable to communicate or move. Neurologic monitoring equipment that helps to more closely check the patient's anesthesia stages is now available to avoid the occurrence of anesthesia awareness.

Did you know?

Earwax has antimicrobial properties that reduce the viability of bacteria and fungus in the human ear.

Did you know?

After a vasectomy, it takes about 12 ejaculations to clear out sperm that were already beyond the blocked area.

Did you know?

The Babylonians wrote numbers in a system that used 60 as the base value rather than the number 10. They did not have a symbol for "zero."

For a complete list of videos, visit our video library