Author Question: When filler metal is graded for rigid control fabrication, the purchaser receives _____. a. AWS ... (Read 73 times)

Mollykgkg

  • Hero Member
  • *****
  • Posts: 529
When filler metal is graded for rigid control fabrication, the purchaser receives _____.
 
  a. AWS Specification A5.7
  b. a Certificate of Conformance
  c. a Certified Chemical Analysis report
  d. no record of chemical composition or strength

Question 2

Carbon steel filler metals are identified by AWS Specification A5.18 and low-alloy steel filler metals are
  identified by AWS Specification _____.
 
  a. A5.10
  b. A5.12
  c. A5.24
  d. A5.28



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

bobsmith

  • Sr. Member
  • ****
  • Posts: 316
Answer to Question 1

b

Answer to Question 2

d




Mollykgkg

  • Member
  • Posts: 529
Reply 2 on: Jul 24, 2018
:D TYSM


rleezy04

  • Member
  • Posts: 322
Reply 3 on: Yesterday
Thanks for the timely response, appreciate it

 

Did you know?

It is believed that humans initially contracted crabs from gorillas about 3 million years ago from either sleeping in gorilla nests or eating the apes.

Did you know?

Since 1988, the CDC has reported a 99% reduction in bacterial meningitis caused by Haemophilus influenzae, due to the introduction of the vaccine against it.

Did you know?

Fewer than 10% of babies are born on their exact due dates, 50% are born within 1 week of the due date, and 90% are born within 2 weeks of the date.

Did you know?

If all the neurons in the human body were lined up, they would stretch more than 600 miles.

Did you know?

More than 2,500 barbiturates have been synthesized. At the height of their popularity, about 50 were marketed for human use.

For a complete list of videos, visit our video library