Author Question: Except for federal contracts, if a change is required in the Contract Documents after signing a ... (Read 50 times)

kwoodring

  • Hero Member
  • *****
  • Posts: 560
Except for federal contracts, if a change is required in the Contract Documents after signing a contract for construction, the type of document used to implement that change is called:
 
  A. a change order
   B. a field order
   C. an addendum
   D. a shop drawing
   E. a Notice to Proceed

Question 2

A resident project representative's principal responsibility on the project is to:
 
  A. assure that the contractor performs per approved plans and specifications.
   B. advise contractor on how to perform his work.
   C. issue change order.
   D. see that contractor performs per codes.
   E. supervise the construction work.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

juiceman1987

  • Sr. Member
  • ****
  • Posts: 316
Answer to Question 1

A

Answer to Question 2

A




kwoodring

  • Member
  • Posts: 560
Reply 2 on: Jul 26, 2018
Gracias!


mohan

  • Member
  • Posts: 362
Reply 3 on: Yesterday
Wow, this really help

 

Did you know?

Urine turns bright yellow if larger than normal amounts of certain substances are consumed; one of these substances is asparagus.

Did you know?

In 2006, a generic antinausea drug named ondansetron was approved. It is used to stop nausea and vomiting associated with surgery, chemotherapy, and radiation therapy.

Did you know?

Children of people with alcoholism are more inclined to drink alcohol or use hard drugs. In fact, they are 400 times more likely to use hard drugs than those who do not have a family history of alcohol addiction.

Did you know?

About 3.2 billion people, nearly half the world population, are at risk for malaria. In 2015, there are about 214 million malaria cases and an estimated 438,000 malaria deaths.

Did you know?

The liver is the only organ that has the ability to regenerate itself after certain types of damage. As much as 25% of the liver can be removed, and it will still regenerate back to its original shape and size. However, the liver cannot regenerate after severe damage caused by alcohol.

For a complete list of videos, visit our video library