Author Question: The term substantial completion, unless redefined in the Contract Documents, normally means that: ... (Read 47 times)

bobypop

  • Hero Member
  • *****
  • Posts: 539
The term substantial completion, unless redefined in the Contract Documents, normally means that:
 
  A. the work is almost completed, but final completion will not occur until a later date.
   B. the contractor's obligations under the contract have been satisfied even though some minor items of pickup work remain.
   C. liquidated damage provisions of the contract still apply until all pickup (punch list) work is completed.
   D. the architect or engineer may not process final payment until a certificate of final completion is executed.
   E. none of the above.

Question 2

Contract documents usually include:
 
  A. shop drawings.
   B. trade standards.
   C. federal specifications.
   D. soils report.
   E. both B and C above.



1_Step_At_ATime

  • Sr. Member
  • ****
  • Posts: 342
Answer to Question 1

B

Answer to Question 2

E



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

People with alcoholism are at a much greater risk of malnutrition than are other people and usually exhibit low levels of most vitamins (especially folic acid). This is because alcohol often takes the place of 50% of their daily intake of calories, with little nutritional value contained in it.

Did you know?

Studies show that systolic blood pressure can be significantly lowered by taking statins. In fact, the higher the patient's baseline blood pressure, the greater the effect of statins on his or her blood pressure.

Did you know?

Acute bronchitis is an inflammation of the breathing tubes (bronchi), which causes increased mucus production and other changes. It is usually caused by bacteria or viruses, can be serious in people who have pulmonary or cardiac diseases, and can lead to pneumonia.

Did you know?

In the United States, congenital cytomegalovirus causes one child to become disabled almost every hour. CMV is the leading preventable viral cause of development disability in newborns. These disabilities include hearing or vision loss, and cerebral palsy.

Did you know?

Patients should never assume they are being given the appropriate drugs. They should make sure they know which drugs are being prescribed, and always double-check that the drugs received match the prescription.

For a complete list of videos, visit our video library