Author Question: What is the difference between a base calendar and a resource calendar? What will be an ideal ... (Read 133 times)

DelorasTo

  • Hero Member
  • *****
  • Posts: 548
What is the difference between a base calendar and a resource calendar?
 
  What will be an ideal response?

Question 2

What is a summary task, and how are summary tasks used for project scheduling?
 
  What will be an ideal response?



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

ankilker

  • Sr. Member
  • ****
  • Posts: 328
Answer to Question 1

A base calendar is a calendar that applies to all the activities on a project. It
indicates the days on which work can be performed, and also indicates such days as
weekends and holidays on which work cannot be performed. The base calendar is
developed when the project schedule is initially created.

A resource calendar is a calendar that applies to a specific resource to define the days, or
periods during the day, when that resource is available. Resource calendars are used for
limited resources that may control the scheduling of multiple activities at the same time.
If no resource calendars are created, the scheduling program assumes that resources are
available during all working hours on every working day.

Answer to Question 2

A summary task is a task representing a general activity of construction, and
usually contains multiple subtasks. An example would be constructing a concrete slab,
which contains multiple subtasks such as initial layout, excavation, preparation of the
base, installation of rebars and other utilities, placement, finishing and curing of the
concrete. Summary tasks are used for project scheduling to provide an outline structure
to the schedule that identifies the project's major phases. Typically, no duration is
initially associated with summary tasks.




DelorasTo

  • Member
  • Posts: 548
Reply 2 on: Jul 26, 2018
YES! Correct, THANKS for helping me on my review


bigcheese9

  • Member
  • Posts: 333
Reply 3 on: Yesterday
Great answer, keep it coming :)

 

Did you know?

Your chance of developing a kidney stone is 1 in 10. In recent years, approximately 3.7 million people in the United States were diagnosed with a kidney disease.

Did you know?

About 3.2 billion people, nearly half the world population, are at risk for malaria. In 2015, there are about 214 million malaria cases and an estimated 438,000 malaria deaths.

Did you know?

The people with the highest levels of LDL are Mexican American males and non-Hispanic black females.

Did you know?

In 1886, William Bates reported on the discovery of a substance produced by the adrenal gland that turned out to be epinephrine (adrenaline). In 1904, this drug was first artificially synthesized by Friedrich Stolz.

Did you know?

Warfarin was developed as a consequence of the study of a strange bleeding disorder that suddenly occurred in cattle on the northern prairies of the United States in the early 1900s.

For a complete list of videos, visit our video library