Author Question: In steel erection, written authorization must notify the steel erection contractor that concrete ... (Read 99 times)

newbem

  • Hero Member
  • *****
  • Posts: 579
In steel erection, written authorization must notify the steel erection contractor that concrete used in footings has withered:
 
  A. Cured to at least 75 of its intended minimum compressive design strength.
  B. Has cured sufficiently to support the loads that will be imposed during erection.
  C. Both A and B.

Question 2

The purpose of ROPS is to keep the operator of the equipment in question from being crushed should the equipment roll over.
 
  Indicate whether the statement is true or false



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

AaaA

  • Sr. Member
  • ****
  • Posts: 339
Answer to Question 1

C

Answer to Question 2

T



newbem

  • Hero Member
  • *****
  • Posts: 579
Both answers were spot on, thank you once again



AaaA

  • Sr. Member
  • ****
  • Posts: 339

 

Did you know?

The heart is located in the center of the chest, with part of it tipped slightly so that it taps against the left side of the chest.

Did you know?

Asthma cases in Americans are about 75% higher today than they were in 1980.

Did you know?

There are 60,000 miles of blood vessels in every adult human.

Did you know?

The horizontal fraction bar was introduced by the Arabs.

Did you know?

The U.S. Preventive Services Task Force recommends that all women age 65 years of age or older should be screened with bone densitometry.

For a complete list of videos, visit our video library