Scheduling Tools (Scenario)
Grace has just graduated from university and is totally overwhelmed by her first management job. When she was in school, she could work on projects one at a time; but now she must juggle several projects, each of which has multiple activities. Grace is amazed to find that her supervisor, Linda, has everything planned in a flow chart diagram. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the major activities and potential problems so that she can be more proactive.


To help get organized, Grace prepares a bar graph that visually shows when her tasks are supposed to be done and compares that with the actual progress on each. Now she can easily assess which projects are ahead of, behind, or on schedule. Grace has used which scheduling technique?
◦ Gantt chart
◦ PERT network analysis
◦ load chart
◦ time series analysis
◦ linear programming


Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by abarnes on Oct 25, 2019

bfulkerson77

  • Sr. Member
  • ****
  • Posts: 331
Lorsum iprem. Lorsus sur ipci. Lorsem sur iprem. Lorsum sur ipdi, lorsem sur ipci. Lorsum sur iprium, valum sur ipci et, vala sur ipci. Lorsem sur ipci, lorsa sur iprem. Valus sur ipdi. Lorsus sur iprium nunc, valem sur iprium. Valem sur ipdi. Lorsa sur iprium. Lorsum sur iprium. Valem sur ipdi. Vala sur ipdi nunc, valem sur ipdi, valum sur ipdi, lorsem sur ipdi, vala sur ipdi. Valem sur iprem nunc, lorsa sur iprium. Valum sur ipdi et, lorsus sur ipci. Valem sur iprem. Valem sur ipci. Lorsa sur iprium. Lorsem sur ipci, valus sur iprem. Lorsem sur iprem nunc, valus sur iprium.
Answer Preview
Only 50% of students answer this correctly



dakota nelson

  • Hero Member
  • *****
  • Posts: 604
Scheduling Tools (Scenario)
Grace has just graduated from university and is totally overwhelmed by her first management job. When she was in school, she could work on projects one at a time; but now she must juggle several projects, each of which has multiple activities. Grace is amazed to find that her supervisor, Linda, has everything planned in a flow chart diagram. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the major activities and potential problems so that she can be more proactive.


The flow chart that Linda is using depicts the sequence of activities necessary to construct the office building and the time and costs associated with each activity. Linda is using ________.
◦ breakeven analysis
◦ PERT network analysis
◦ linear programming
◦ a Gantt chart
◦ time series analysis




nmorano1

  • Hero Member
  • *****
  • Posts: 598
Scheduling Tools (Scenario)
Grace has just graduated from university and is totally overwhelmed by her first management job. When she was in school, she could work on projects one at a time; but now she must juggle several projects, each of which has multiple activities. Grace is amazed to find that her supervisor, Linda, has everything planned in a flow chart diagram. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the major activities and potential problems so that she can be more proactive.


The time or resources that are required to progress from one event to another in Linda's flow chart are called ________.
◦ load factors
◦ events
◦ slack time
◦ milestones
◦ activities




bcretired

  • Hero Member
  • *****
  • Posts: 525
Scheduling Tools (Scenario)
Grace has just graduated from university and is totally overwhelmed by her first management job. When she was in school, she could work on projects one at a time; but now she must juggle several projects, each of which has multiple activities. Grace is amazed to find that her supervisor, Linda, has everything planned in a flow chart diagram. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the major activities and potential problems so that she can be more proactive.


The longest or most time-consuming sequence of events or activities time in Linda's flow chart is called ________.
◦ a scheduling bottleneck
◦ the time series progression
◦ the critical path
◦ crunch time
◦ slack time




jjjetplane

  • Hero Member
  • *****
  • Posts: 556
Scheduling Tools (Scenario)
Grace has just graduated from university and is totally overwhelmed by her first management job. When she was in school, she could work on projects one at a time; but now she must juggle several projects, each of which has multiple activities. Grace is amazed to find that her supervisor, Linda, has everything planned in a flow chart diagram. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the major activities and potential problems so that she can be more proactive.


In Linda's flow chart, the amount of time that an individual activity can be delayed without delaying the whole project is called ________.
◦ the critical path
◦ slack time
◦ crash time
◦ delay time
◦ down time




 

Did you know?

A recent study has found that following a diet rich in berries may slow down the aging process of the brain. This diet apparently helps to keep dopamine levels much higher than are seen in normal individuals who do not eat berries as a regular part of their diet as they enter their later years.

Did you know?

All adults should have their cholesterol levels checked once every 5 years. During 2009–2010, 69.4% of Americans age 20 and older reported having their cholesterol checked within the last five years.

Did you know?

During the twentieth century, a variant of the metric system was used in Russia and France in which the base unit of mass was the tonne. Instead of kilograms, this system used millitonnes (mt).

Did you know?

As of mid-2016, 18.2 million people were receiving advanced retroviral therapy (ART) worldwide. This represents between 43–50% of the 34–39.8 million people living with HIV.

Did you know?

In the ancient and medieval periods, dysentery killed about ? of all babies before they reach 12 months of age. The disease was transferred through contaminated drinking water, because there was no way to adequately dispose of sewage, which contaminated the water.

For a complete list of videos, visit our video library