Scheduling Tools (Scenario)
Grace has just graduated from university and is totally overwhelmed by her first management job. When she was in school, she could work on projects one at a time; but now she must juggle several projects, each of which has multiple activities. Grace is amazed to find that her supervisor, Linda, has everything planned in a flow chart diagram. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the major activities and potential problems so that she can be more proactive.


To help get organized, Grace prepares a bar graph that visually shows when her tasks are supposed to be done and compares that with the actual progress on each. Now she can easily assess which projects are ahead of, behind, or on schedule. Grace has used which scheduling technique?
◦ Gantt chart
◦ PERT network analysis
◦ load chart
◦ time series analysis
◦ linear programming


Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by abarnes on Oct 25, 2019

bfulkerson77

  • Sr. Member
  • ****
  • Posts: 331
Lorsum iprem. Lorsus sur ipci. Lorsem sur iprem. Lorsum sur ipdi, lorsem sur ipci. Lorsum sur iprium, valum sur ipci et, vala sur ipci. Lorsem sur ipci, lorsa sur iprem. Valus sur ipdi. Lorsus sur iprium nunc, valem sur iprium. Valem sur ipdi. Lorsa sur iprium. Lorsum sur iprium. Valem sur ipdi. Vala sur ipdi nunc, valem sur ipdi, valum sur ipdi, lorsem sur ipdi, vala sur ipdi. Valem sur iprem nunc, lorsa sur iprium. Valum sur ipdi et, lorsus sur ipci. Valem sur iprem. Valem sur ipci. Lorsa sur iprium. Lorsem sur ipci, valus sur iprem. Lorsem sur iprem nunc, valus sur iprium.
Answer Preview
Only 50% of students answer this correctly



dakota nelson

  • Hero Member
  • *****
  • Posts: 604
Scheduling Tools (Scenario)
Grace has just graduated from university and is totally overwhelmed by her first management job. When she was in school, she could work on projects one at a time; but now she must juggle several projects, each of which has multiple activities. Grace is amazed to find that her supervisor, Linda, has everything planned in a flow chart diagram. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the major activities and potential problems so that she can be more proactive.


The flow chart that Linda is using depicts the sequence of activities necessary to construct the office building and the time and costs associated with each activity. Linda is using ________.
◦ breakeven analysis
◦ PERT network analysis
◦ linear programming
◦ a Gantt chart
◦ time series analysis




nmorano1

  • Hero Member
  • *****
  • Posts: 598
Scheduling Tools (Scenario)
Grace has just graduated from university and is totally overwhelmed by her first management job. When she was in school, she could work on projects one at a time; but now she must juggle several projects, each of which has multiple activities. Grace is amazed to find that her supervisor, Linda, has everything planned in a flow chart diagram. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the major activities and potential problems so that she can be more proactive.


The time or resources that are required to progress from one event to another in Linda's flow chart are called ________.
◦ load factors
◦ events
◦ slack time
◦ milestones
◦ activities




bcretired

  • Hero Member
  • *****
  • Posts: 525
Scheduling Tools (Scenario)
Grace has just graduated from university and is totally overwhelmed by her first management job. When she was in school, she could work on projects one at a time; but now she must juggle several projects, each of which has multiple activities. Grace is amazed to find that her supervisor, Linda, has everything planned in a flow chart diagram. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the major activities and potential problems so that she can be more proactive.


The longest or most time-consuming sequence of events or activities time in Linda's flow chart is called ________.
◦ a scheduling bottleneck
◦ the time series progression
◦ the critical path
◦ crunch time
◦ slack time




jjjetplane

  • Hero Member
  • *****
  • Posts: 556
Scheduling Tools (Scenario)
Grace has just graduated from university and is totally overwhelmed by her first management job. When she was in school, she could work on projects one at a time; but now she must juggle several projects, each of which has multiple activities. Grace is amazed to find that her supervisor, Linda, has everything planned in a flow chart diagram. Linda's current project is to oversee the construction of an office building, and Grace is determined to understand all of the major activities and potential problems so that she can be more proactive.


In Linda's flow chart, the amount of time that an individual activity can be delayed without delaying the whole project is called ________.
◦ the critical path
◦ slack time
◦ crash time
◦ delay time
◦ down time




 

Did you know?

Signs and symptoms that may signify an eye tumor include general blurred vision, bulging eye(s), double vision, a sensation of a foreign body in the eye(s), iris defects, limited ability to move the eyelid(s), limited ability to move the eye(s), pain or discomfort in or around the eyes or eyelids, red or pink eyes, white or cloud spots on the eye(s), colored spots on the eyelid(s), swelling around the eyes, swollen eyelid(s), and general vision loss.

Did you know?

The modern decimal position system was the invention of the Hindus (around 800 AD), involving the placing of numerals to indicate their value (units, tens, hundreds, and so on).

Did you know?

When Gabriel Fahrenheit invented the first mercury thermometer, he called "zero degrees" the lowest temperature he was able to attain with a mixture of ice and salt. For the upper point of his scale, he used 96°, which he measured as normal human body temperature (we know it to be 98.6° today because of more accurate thermometers).

Did you know?

According to the Migraine Research Foundation, migraines are the third most prevalent illness in the world. Women are most affected (18%), followed by children of both sexes (10%), and men (6%).

Did you know?

The most dangerous mercury compound, dimethyl mercury, is so toxic that even a few microliters spilled on the skin can cause death. Mercury has been shown to accumulate in higher amounts in the following types of fish than other types: swordfish, shark, mackerel, tilefish, crab, and tuna.

For a complete list of videos, visit our video library