This topic contains a solution. Click here to go to the answer

Author Question: There are four assembly processes. Name all four, and pick two to discuss in ... (Read 23 times)

big1devin

  • Hero Member
  • *****
  • Posts: 583
There are four assembly processes. Name all four, and pick two to discuss in detail.

Question 2

Describe three possible growth strategies for retailers.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

jliusyl

  • Sr. Member
  • ****
  • Posts: 328
Answer to Question 1

Products are built either according to plan or to demand. Their production occurs via either a make-to-stock (MTS) or a make-to-order (MTO) manufacturing process. MTO can be segmented into three variations: assemble-to-order (ATO), build-to-order (BTO), and engineer-to-order (ETO). Each process is appropriate for some types of products.

Make-to-stock is the traditional production method where end-item products are finished before receipt of a customer order.

Assemble-to-order product assembly commences after receipt of a customer's order. The finished ATO product is generally a combination of common components and a limited number of options or accessories made available to the customer. The individual components are often stocked in anticipation of demand, but the finished goods are not assembled until customers place orders for their desired products.

The build-to-order production approach also delays assembly until a confirmed order is received for the product. The end-item finished product is generally a combination of standard and custom-designed components that meet the unique needs of a specific customer. It differs from ATO in the higher level of customization and lower volume level of production. BTO is considered a good choice for products that require some custom configuration, such as a private jet where the aircraft is a standard model but the customer specifies the avionics and interior design. It is also effective for situations where holding finished goods inventories in anticipation of demand is very expensive.

Engineer-to-order production focuses on the creation of highly tailored products for customers whose specifications require unique engineering design or significant customization. In this manufacturing environment, no two products are identical, and each order requires detailed cost estimates and tailored pricing. Also known as project manufacturing, successful ETO initiatives depend on effective collaboration between all supply chain participants.

Answer to Question 2

One way for a retailer to grow is to offer additional services to better serve the customers it already has. This includes grocery stores that have added other things like banks, photography studios, nail salons, florists, etc. A second strategy is to maintain its focus on its current services but reach out to attract new segments of customers. Or, a retailer can decide to go multisite by opening additional stores. When they do this, they have to make sure they are able to do quality control across locations.




big1devin

  • Member
  • Posts: 583
Reply 2 on: Jun 28, 2018
Wow, this really help


mammy1697

  • Member
  • Posts: 341
Reply 3 on: Yesterday
YES! Correct, THANKS for helping me on my review

 

Did you know?

After a vasectomy, it takes about 12 ejaculations to clear out sperm that were already beyond the blocked area.

Did you know?

Today, nearly 8 out of 10 pregnant women living with HIV (about 1.1 million), receive antiretrovirals.

Did you know?

The Babylonians wrote numbers in a system that used 60 as the base value rather than the number 10. They did not have a symbol for "zero."

Did you know?

A recent study has found that following a diet rich in berries may slow down the aging process of the brain. This diet apparently helps to keep dopamine levels much higher than are seen in normal individuals who do not eat berries as a regular part of their diet as they enter their later years.

Did you know?

Critical care patients are twice as likely to receive the wrong medication. Of these errors, 20% are life-threatening, and 42% require additional life-sustaining treatments.

For a complete list of videos, visit our video library