This topic contains a solution. Click here to go to the answer

Author Question: There are four assembly processes. Name all four, and pick two to discuss in ... (Read 10 times)

big1devin

  • Hero Member
  • *****
  • Posts: 583
There are four assembly processes. Name all four, and pick two to discuss in detail.

Question 2

Describe three possible growth strategies for retailers.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

jliusyl

  • Sr. Member
  • ****
  • Posts: 328
Answer to Question 1

Products are built either according to plan or to demand. Their production occurs via either a make-to-stock (MTS) or a make-to-order (MTO) manufacturing process. MTO can be segmented into three variations: assemble-to-order (ATO), build-to-order (BTO), and engineer-to-order (ETO). Each process is appropriate for some types of products.

Make-to-stock is the traditional production method where end-item products are finished before receipt of a customer order.

Assemble-to-order product assembly commences after receipt of a customer's order. The finished ATO product is generally a combination of common components and a limited number of options or accessories made available to the customer. The individual components are often stocked in anticipation of demand, but the finished goods are not assembled until customers place orders for their desired products.

The build-to-order production approach also delays assembly until a confirmed order is received for the product. The end-item finished product is generally a combination of standard and custom-designed components that meet the unique needs of a specific customer. It differs from ATO in the higher level of customization and lower volume level of production. BTO is considered a good choice for products that require some custom configuration, such as a private jet where the aircraft is a standard model but the customer specifies the avionics and interior design. It is also effective for situations where holding finished goods inventories in anticipation of demand is very expensive.

Engineer-to-order production focuses on the creation of highly tailored products for customers whose specifications require unique engineering design or significant customization. In this manufacturing environment, no two products are identical, and each order requires detailed cost estimates and tailored pricing. Also known as project manufacturing, successful ETO initiatives depend on effective collaboration between all supply chain participants.

Answer to Question 2

One way for a retailer to grow is to offer additional services to better serve the customers it already has. This includes grocery stores that have added other things like banks, photography studios, nail salons, florists, etc. A second strategy is to maintain its focus on its current services but reach out to attract new segments of customers. Or, a retailer can decide to go multisite by opening additional stores. When they do this, they have to make sure they are able to do quality control across locations.




big1devin

  • Member
  • Posts: 583
Reply 2 on: Jun 28, 2018
Great answer, keep it coming :)


mohan

  • Member
  • Posts: 362
Reply 3 on: Yesterday
YES! Correct, THANKS for helping me on my review

 

Did you know?

Many people have small pouches in their colons that bulge outward through weak spots. Each pouch is called a diverticulum. About 10% of Americans older than age 40 years have diverticulosis, which, when the pouches become infected or inflamed, is called diverticulitis. The main cause of diverticular disease is a low-fiber diet.

Did you know?

It is widely believed that giving a daily oral dose of aspirin to heart attack patients improves their chances of survival because the aspirin blocks the formation of new blood clots.

Did you know?

Always store hazardous household chemicals in their original containers out of reach of children. These include bleach, paint, strippers and products containing turpentine, garden chemicals, oven cleaners, fondue fuels, nail polish, and nail polish remover.

Did you know?

Although not all of the following muscle groups are commonly used, intramuscular injections may be given into the abdominals, biceps, calves, deltoids, gluteals, laterals, pectorals, quadriceps, trapezoids, and triceps.

Did you know?

Acetaminophen (Tylenol) in overdose can seriously damage the liver. It should never be taken by people who use alcohol heavily; it can result in severe liver damage and even a condition requiring a liver transplant.

For a complete list of videos, visit our video library