Author Question: Job date is the primary key for job table. Indicate whether the statement is true or ... (Read 49 times)

Zoey63294

  • Hero Member
  • *****
  • Posts: 539
Job date is the primary key for job table.
 
  Indicate whether the statement is true or false

Question 2

Discuss some of the key aspects to developing successful process and systems development projects.
 
  What will be an ideal response?


cupcake16

  • Sr. Member
  • ****
  • Posts: 309
Answer to Question 1

FALSE

Answer to Question 2

The key aspects to developing successful systems development life cycle (SDLC) include:
 Create a work breakdown structureSuccessful project managers break large projects into smaller tasks until each task is small enough to estimate and to manage. Every task should culminate in one or more results called deliverables. Tasks are interrelated, and to prevent them from becoming confusing, project teams create a work breakdown structure (WBS), which is a hierarchy of the tasks required to complete a project.
 Estimate time and costsIt is exceedingly difficult to determine duration and labor requirements for many development tasks. Organizations take a variety of approaches to this challenge. One is to avoid scheduling problems altogether and never develop systems and software in-house. Instead, they license packages, such as ERP systems, that include both business processes and information systems components. If no suitable package exists, companies can admit the impossibility of scheduling a date for the completion of the entire system and take the best result they can get. The third approach is to attempt to schedule the development project in spite of all the difficulties.
 Create a project planA project plan is a list of WBS tasks, arranged to account for task dependencies, with durations and resources applied. Some tasks cannot be started or finished until other tasks are completed. Given dependencies, estimates for task duration and resource requirements are then applied to the WBS to form a project plan. The critical path is the sequence of activities that determine the earliest date by which the project can be completed. The earliest date is the date determined by considering the longest path through the network of activities. Paying attention to task dependencies, the planner will compress the tasks as much as possible. Those tasks that cannot be further compressed lie on the critical path.
 Adjust the plan via trade-offsThe project plan for the entire project results in a finish date and a total cost. Schedules and costs can be responsibly reduced by considering trade-offs. A trade-off is a balancing of three critical factors: requirements, cost, and time.
 Manage development challengesNothing ever goes according to plan, and the larger the project and the longer the development interval, the more things will violate the plan. Four critical factors need to be considered:
- Coordination
- Diseconomies of scale
- Configuration control
- Unexpected events



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Not getting enough sleep can greatly weaken the immune system. Lack of sleep makes you more likely to catch a cold, or more difficult to fight off an infection.

Did you know?

Most strokes are caused when blood clots move to a blood vessel in the brain and block blood flow to that area. Thrombolytic therapy can be used to dissolve the clot quickly. If given within 3 hours of the first stroke symptoms, this therapy can help limit stroke damage and disability.

Did you know?

The most destructive flu epidemic of all times in recorded history occurred in 1918, with approximately 20 million deaths worldwide.

Did you know?

In 2006, a generic antinausea drug named ondansetron was approved. It is used to stop nausea and vomiting associated with surgery, chemotherapy, and radiation therapy.

Did you know?

Every flu season is different, and even healthy people can get extremely sick from the flu, as well as spread it to others. The flu season can begin as early as October and last as late as May. Every person over six months of age should get an annual flu vaccine. The vaccine cannot cause you to get influenza, but in some seasons, may not be completely able to prevent you from acquiring influenza due to changes in causative viruses. The viruses in the flu shot are killed—there is no way they can give you the flu. Minor side effects include soreness, redness, or swelling where the shot was given. It is possible to develop a slight fever, and body aches, but these are simply signs that the body is responding to the vaccine and making itself ready to fight off the influenza virus should you come in contact with it.

For a complete list of videos, visit our video library