Author Question: Job date is the primary key for job table. Indicate whether the statement is true or ... (Read 53 times)

Zoey63294

  • Hero Member
  • *****
  • Posts: 539
Job date is the primary key for job table.
 
  Indicate whether the statement is true or false

Question 2

Discuss some of the key aspects to developing successful process and systems development projects.
 
  What will be an ideal response?


cupcake16

  • Sr. Member
  • ****
  • Posts: 309
Answer to Question 1

FALSE

Answer to Question 2

The key aspects to developing successful systems development life cycle (SDLC) include:
 Create a work breakdown structureSuccessful project managers break large projects into smaller tasks until each task is small enough to estimate and to manage. Every task should culminate in one or more results called deliverables. Tasks are interrelated, and to prevent them from becoming confusing, project teams create a work breakdown structure (WBS), which is a hierarchy of the tasks required to complete a project.
 Estimate time and costsIt is exceedingly difficult to determine duration and labor requirements for many development tasks. Organizations take a variety of approaches to this challenge. One is to avoid scheduling problems altogether and never develop systems and software in-house. Instead, they license packages, such as ERP systems, that include both business processes and information systems components. If no suitable package exists, companies can admit the impossibility of scheduling a date for the completion of the entire system and take the best result they can get. The third approach is to attempt to schedule the development project in spite of all the difficulties.
 Create a project planA project plan is a list of WBS tasks, arranged to account for task dependencies, with durations and resources applied. Some tasks cannot be started or finished until other tasks are completed. Given dependencies, estimates for task duration and resource requirements are then applied to the WBS to form a project plan. The critical path is the sequence of activities that determine the earliest date by which the project can be completed. The earliest date is the date determined by considering the longest path through the network of activities. Paying attention to task dependencies, the planner will compress the tasks as much as possible. Those tasks that cannot be further compressed lie on the critical path.
 Adjust the plan via trade-offsThe project plan for the entire project results in a finish date and a total cost. Schedules and costs can be responsibly reduced by considering trade-offs. A trade-off is a balancing of three critical factors: requirements, cost, and time.
 Manage development challengesNothing ever goes according to plan, and the larger the project and the longer the development interval, the more things will violate the plan. Four critical factors need to be considered:
- Coordination
- Diseconomies of scale
- Configuration control
- Unexpected events



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Thyroid conditions may make getting pregnant impossible.

Did you know?

Most strokes are caused when blood clots move to a blood vessel in the brain and block blood flow to that area. Thrombolytic therapy can be used to dissolve the clot quickly. If given within 3 hours of the first stroke symptoms, this therapy can help limit stroke damage and disability.

Did you know?

Malaria mortality rates are falling. Increased malaria prevention and control measures have greatly improved these rates. Since 2000, malaria mortality rates have fallen globally by 60% among all age groups, and by 65% among children under age 5.

Did you know?

More than nineteen million Americans carry the factor V gene that causes blood clots, pulmonary embolism, and heart disease.

Did you know?

As of mid-2016, 18.2 million people were receiving advanced retroviral therapy (ART) worldwide. This represents between 43–50% of the 34–39.8 million people living with HIV.

For a complete list of videos, visit our video library