Job date is the primary key for job table.
 
  Indicate whether the statement is true or false

Question 2

Discuss some of the key aspects to developing successful process and systems development projects.
 
  What will be an ideal response?


cupcake16

  • Sr. Member
  • ****
  • Posts: 309
Answer to Question 1

FALSE

Answer to Question 2

The key aspects to developing successful systems development life cycle (SDLC) include:
 Create a work breakdown structureSuccessful project managers break large projects into smaller tasks until each task is small enough to estimate and to manage. Every task should culminate in one or more results called deliverables. Tasks are interrelated, and to prevent them from becoming confusing, project teams create a work breakdown structure (WBS), which is a hierarchy of the tasks required to complete a project.
 Estimate time and costsIt is exceedingly difficult to determine duration and labor requirements for many development tasks. Organizations take a variety of approaches to this challenge. One is to avoid scheduling problems altogether and never develop systems and software in-house. Instead, they license packages, such as ERP systems, that include both business processes and information systems components. If no suitable package exists, companies can admit the impossibility of scheduling a date for the completion of the entire system and take the best result they can get. The third approach is to attempt to schedule the development project in spite of all the difficulties.
 Create a project planA project plan is a list of WBS tasks, arranged to account for task dependencies, with durations and resources applied. Some tasks cannot be started or finished until other tasks are completed. Given dependencies, estimates for task duration and resource requirements are then applied to the WBS to form a project plan. The critical path is the sequence of activities that determine the earliest date by which the project can be completed. The earliest date is the date determined by considering the longest path through the network of activities. Paying attention to task dependencies, the planner will compress the tasks as much as possible. Those tasks that cannot be further compressed lie on the critical path.
 Adjust the plan via trade-offsThe project plan for the entire project results in a finish date and a total cost. Schedules and costs can be responsibly reduced by considering trade-offs. A trade-off is a balancing of three critical factors: requirements, cost, and time.
 Manage development challengesNothing ever goes according to plan, and the larger the project and the longer the development interval, the more things will violate the plan. Four critical factors need to be considered:
- Coordination
- Diseconomies of scale
- Configuration control
- Unexpected events



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The first documented use of surgical anesthesia in the United States was in Connecticut in 1844.

Did you know?

Although puberty usually occurs in the early teenage years, the world's youngest parents were two Chinese children who had their first baby when they were 8 and 9 years of age.

Did you know?

People who have myopia, or nearsightedness, are not able to see objects at a distance but only up close. It occurs when the cornea is either curved too steeply, the eye is too long, or both. This condition is progressive and worsens with time. More than 100 million people in the United States are nearsighted, but only 20% of those are born with the condition. Diet, eye exercise, drug therapy, and corrective lenses can all help manage nearsightedness.

Did you know?

The most dangerous mercury compound, dimethyl mercury, is so toxic that even a few microliters spilled on the skin can cause death. Mercury has been shown to accumulate in higher amounts in the following types of fish than other types: swordfish, shark, mackerel, tilefish, crab, and tuna.

Did you know?

The longest a person has survived after a heart transplant is 24 years.

For a complete list of videos, visit our video library