Discuss some of the key aspects to developing successful process and systems development projects.
 
  What will be an ideal response?


cupcake16

  • Sr. Member
  • ****
  • Posts: 309
Answer to Question 1

FALSE

Answer to Question 2

The key aspects to developing successful systems development life cycle (SDLC) include:
 Create a work breakdown structureSuccessful project managers break large projects into smaller tasks until each task is small enough to estimate and to manage. Every task should culminate in one or more results called deliverables. Tasks are interrelated, and to prevent them from becoming confusing, project teams create a work breakdown structure (WBS), which is a hierarchy of the tasks required to complete a project.
 Estimate time and costsIt is exceedingly difficult to determine duration and labor requirements for many development tasks. Organizations take a variety of approaches to this challenge. One is to avoid scheduling problems altogether and never develop systems and software in-house. Instead, they license packages, such as ERP systems, that include both business processes and information systems components. If no suitable package exists, companies can admit the impossibility of scheduling a date for the completion of the entire system and take the best result they can get. The third approach is to attempt to schedule the development project in spite of all the difficulties.
 Create a project planA project plan is a list of WBS tasks, arranged to account for task dependencies, with durations and resources applied. Some tasks cannot be started or finished until other tasks are completed. Given dependencies, estimates for task duration and resource requirements are then applied to the WBS to form a project plan. The critical path is the sequence of activities that determine the earliest date by which the project can be completed. The earliest date is the date determined by considering the longest path through the network of activities. Paying attention to task dependencies, the planner will compress the tasks as much as possible. Those tasks that cannot be further compressed lie on the critical path.
 Adjust the plan via trade-offsThe project plan for the entire project results in a finish date and a total cost. Schedules and costs can be responsibly reduced by considering trade-offs. A trade-off is a balancing of three critical factors: requirements, cost, and time.
 Manage development challengesNothing ever goes according to plan, and the larger the project and the longer the development interval, the more things will violate the plan. Four critical factors need to be considered:
- Coordination
- Diseconomies of scale
- Configuration control
- Unexpected events



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The toxic levels for lithium carbonate are close to the therapeutic levels. Signs of toxicity include fine hand tremor, polyuria, mild thirst, nausea, general discomfort, diarrhea, vomiting, drowsiness, muscular weakness, lack of coordination, ataxia, giddiness, tinnitus, and blurred vision.

Did you know?

Tobacco depletes the body of vitamins A, C, and E, which can result in any of the following: dry hair, dry skin, dry eyes, poor growth, night blindness, abscesses, insomnia, fatigue, reproductive system problems, sinusitis, pneumonia, frequent respiratory problems, skin disorders, weight loss, rickets, osteomalacia, nervousness, muscle spasms, leg cramps, extremity numbness, bone malformations, decayed teeth, difficulty in walking, irritability, restlessness, profuse sweating, increased uric acid (gout), joint damage, damaged red blood cells, destruction of nerves, infertility, miscarriage, and many types of cancer.

Did you know?

Before a vaccine is licensed in the USA, the Food and Drug Administration (FDA) reviews it for safety and effectiveness. The CDC then reviews all studies again, as well as the American Academy of Pediatrics and the American Academy of Family Physicians. Every lot of vaccine is tested before administration to the public, and the FDA regularly inspects vaccine manufacturers' facilities.

Did you know?

More than nineteen million Americans carry the factor V gene that causes blood clots, pulmonary embolism, and heart disease.

Did you know?

A seasonal flu vaccine is the best way to reduce the chances you will get seasonal influenza and spread it to others.

For a complete list of videos, visit our video library