Author Question: Gantt and PERT charts are two common formal planning tools for project management. Indicate ... (Read 63 times)

tingc95

  • Hero Member
  • *****
  • Posts: 556
Gantt and PERT charts are two common formal planning tools for project management.
 
  Indicate whether the statement is true or false

Question 2

In which design phase of the SDLC are logical specifications of the system from logical design transformed into technology-specific details from which all programming and system construction can be accomplished?
 
  A) Logical design
  B) Physical design
  C) Conceptual design
  D) High level design


flannelavenger

  • Sr. Member
  • ****
  • Posts: 322
Answer to Question 1

TRUE

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

The most destructive flu epidemic of all times in recorded history occurred in 1918, with approximately 20 million deaths worldwide.

Did you know?

No drugs are available to relieve parathyroid disease. Parathyroid disease is caused by a parathyroid tumor, and it needs to be removed by surgery.

Did you know?

The human body's pharmacokinetics are quite varied. Our hair holds onto drugs longer than our urine, blood, or saliva. For example, alcohol can be detected in the hair for up to 90 days after it was consumed. The same is true for marijuana, cocaine, ecstasy, heroin, methamphetamine, and nicotine.

Did you know?

Serum cholesterol testing in adults is recommended every 1 to 5 years. People with diabetes and a family history of high cholesterol should be tested even more frequently.

Did you know?

The B-complex vitamins and vitamin C are not stored in the body and must be replaced each day.

For a complete list of videos, visit our video library