Author Question: Gantt and PERT charts are two common formal planning tools for project management. Indicate ... (Read 106 times)

tingc95

  • Hero Member
  • *****
  • Posts: 556
Gantt and PERT charts are two common formal planning tools for project management.
 
  Indicate whether the statement is true or false

Question 2

In which design phase of the SDLC are logical specifications of the system from logical design transformed into technology-specific details from which all programming and system construction can be accomplished?
 
  A) Logical design
  B) Physical design
  C) Conceptual design
  D) High level design


flannelavenger

  • Sr. Member
  • ****
  • Posts: 322
Answer to Question 1

TRUE

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

Cucumber slices relieve headaches by tightening blood vessels, reducing blood flow to the area, and relieving pressure.

Did you know?

Approximately 500,000 babies are born each year in the United States to teenage mothers.

Did you know?

Many of the drugs used by neuroscientists are derived from toxic plants and venomous animals (such as snakes, spiders, snails, and puffer fish).

Did you know?

No drugs are available to relieve parathyroid disease. Parathyroid disease is caused by a parathyroid tumor, and it needs to be removed by surgery.

Did you know?

There are over 65,000 known species of protozoa. About 10,000 species are parasitic.

For a complete list of videos, visit our video library