Author Question: Gantt and PERT charts are two common formal planning tools for project management. Indicate ... (Read 52 times)

tingc95

  • Hero Member
  • *****
  • Posts: 556
Gantt and PERT charts are two common formal planning tools for project management.
 
  Indicate whether the statement is true or false

Question 2

In which design phase of the SDLC are logical specifications of the system from logical design transformed into technology-specific details from which all programming and system construction can be accomplished?
 
  A) Logical design
  B) Physical design
  C) Conceptual design
  D) High level design


flannelavenger

  • Sr. Member
  • ****
  • Posts: 322
Answer to Question 1

TRUE

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

Less than one of every three adults with high LDL cholesterol has the condition under control. Only 48.1% with the condition are being treated for it.

Did you know?

It is believed that the Incas used anesthesia. Evidence supports the theory that shamans chewed cocoa leaves and drilled holes into the heads of patients (letting evil spirits escape), spitting into the wounds they made. The mixture of cocaine, saliva, and resin numbed the site enough to allow hours of drilling.

Did you know?

Lower drug doses for elderly patients should be used first, with titrations of the dose as tolerated to prevent unwanted drug-related pharmacodynamic effects.

Did you know?

All adults should have their cholesterol levels checked once every 5 years. During 2009–2010, 69.4% of Americans age 20 and older reported having their cholesterol checked within the last five years.

Did you know?

Acetaminophen (Tylenol) in overdose can seriously damage the liver. It should never be taken by people who use alcohol heavily; it can result in severe liver damage and even a condition requiring a liver transplant.

For a complete list of videos, visit our video library