Author Question: Gantt and PERT charts are two common formal planning tools for project management. Indicate ... (Read 100 times)

tingc95

  • Hero Member
  • *****
  • Posts: 556
Gantt and PERT charts are two common formal planning tools for project management.
 
  Indicate whether the statement is true or false

Question 2

In which design phase of the SDLC are logical specifications of the system from logical design transformed into technology-specific details from which all programming and system construction can be accomplished?
 
  A) Logical design
  B) Physical design
  C) Conceptual design
  D) High level design


flannelavenger

  • Sr. Member
  • ****
  • Posts: 322
Answer to Question 1

TRUE

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

Not getting enough sleep can greatly weaken the immune system. Lack of sleep makes you more likely to catch a cold, or more difficult to fight off an infection.

Did you know?

Once thought to have neurofibromatosis, Joseph Merrick (also known as "the elephant man") is now, in retrospect, thought by clinical experts to have had Proteus syndrome. This endocrine disease causes continued and abnormal growth of the bones, muscles, skin, and so on and can become completely debilitating with severe deformities occurring anywhere on the body.

Did you know?

Less than one of every three adults with high LDL cholesterol has the condition under control. Only 48.1% with the condition are being treated for it.

Did you know?

Since 1988, the CDC has reported a 99% reduction in bacterial meningitis caused by Haemophilus influenzae, due to the introduction of the vaccine against it.

Did you know?

Studies show that systolic blood pressure can be significantly lowered by taking statins. In fact, the higher the patient's baseline blood pressure, the greater the effect of statins on his or her blood pressure.

For a complete list of videos, visit our video library