Author Question: Gantt and PERT charts are two common formal planning tools for project management. Indicate ... (Read 119 times)

tingc95

  • Hero Member
  • *****
  • Posts: 556
Gantt and PERT charts are two common formal planning tools for project management.
 
  Indicate whether the statement is true or false

Question 2

In which design phase of the SDLC are logical specifications of the system from logical design transformed into technology-specific details from which all programming and system construction can be accomplished?
 
  A) Logical design
  B) Physical design
  C) Conceptual design
  D) High level design


flannelavenger

  • Sr. Member
  • ****
  • Posts: 322
Answer to Question 1

TRUE

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

It is important to read food labels and choose foods with low cholesterol and saturated trans fat. You should limit saturated fat to no higher than 6% of daily calories.

Did you know?

There are actually 60 minerals, 16 vitamins, 12 essential amino acids, and three essential fatty acids that your body needs every day.

Did you know?

Chronic marijuana use can damage the white blood cells and reduce the immune system's ability to respond to disease by as much as 40%. Without a strong immune system, the body is vulnerable to all kinds of degenerative and infectious diseases.

Did you know?

In the United States, there is a birth every 8 seconds, according to the U.S. Census Bureau's Population Clock.

Did you know?

Amphetamine poisoning can cause intravascular coagulation, circulatory collapse, rhabdomyolysis, ischemic colitis, acute psychosis, hyperthermia, respiratory distress syndrome, and pericarditis.

For a complete list of videos, visit our video library