To review a project's tasks and their interrelationships, you would use a
 
  A) PERT chart.
  B) Gantt chart.
  C) either A or B.
  D) neither A nor B.

Question 2

Digital subscriber lines
 
  A) operate over existing telephone lines to carry voice, data, and video.
  B) operate over coaxial cable lines to deliver Internet access.
  C) are very-high-speed data lines typically leased from long-distance telephone companies.
  D) have up to twenty-four 64-Kbps channels.
  E) are assigned to every computer on the Internet.



mochi09

  • Sr. Member
  • ****
  • Posts: 335
Answer to Question 1

A

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

To combat osteoporosis, changes in lifestyle and diet are recommended. At-risk patients should include 1,200 to 1,500 mg of calcium daily either via dietary means or with supplements.

Did you know?

Excessive alcohol use costs the country approximately $235 billion every year.

Did you know?

During the twentieth century, a variant of the metric system was used in Russia and France in which the base unit of mass was the tonne. Instead of kilograms, this system used millitonnes (mt).

Did you know?

Oliver Wendell Holmes is credited with introducing the words "anesthesia" and "anesthetic" into the English language in 1846.

Did you know?

To prove that stomach ulcers were caused by bacteria and not by stress, a researcher consumed an entire laboratory beaker full of bacterial culture. After this, he did indeed develop stomach ulcers, and won the Nobel Prize for his discovery.

For a complete list of videos, visit our video library