When the owner and the construction contractor agree to a predetermined price that cannot be exceeded for the construction work, but will both share in any savings generated by the work being completed a price that is lower than the predetermined price; the contract format is known as ___________________ ______ contract.
 
  A. maximum guaranteed price
  B. incentive and penalty
  C. cost plus fixed fee
  D. unit price

Question 2

A set of construction documents that show how the construction was actually performed are known by the name ___________________ __.
 
  A. as-built drawings
  B. presentation drawings
  C. commissioning drawings
  D. none of the above



ASDFGJLO

  • Sr. Member
  • ****
  • Posts: 335
Answer to Question 1

A

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

Warfarin was developed as a consequence of the study of a strange bleeding disorder that suddenly occurred in cattle on the northern prairies of the United States in the early 1900s.

Did you know?

It is difficult to obtain enough calcium without consuming milk or other dairy foods.

Did you know?

Human neurons are so small that they require a microscope in order to be seen. However, some neurons can be up to 3 feet long, such as those that extend from the spinal cord to the toes.

Did you know?

Between 1999 and 2012, American adults with high total cholesterol decreased from 18.3% to 12.9%

Did you know?

People with alcoholism are at a much greater risk of malnutrition than are other people and usually exhibit low levels of most vitamins (especially folic acid). This is because alcohol often takes the place of 50% of their daily intake of calories, with little nutritional value contained in it.

For a complete list of videos, visit our video library