When the owner and the construction contractor agree to a predetermined price that cannot be exceeded for the construction work, but will both share in any savings generated by the work being completed a price that is lower than the predetermined price; the contract format is known as ___________________ ______ contract.
 
  A. maximum guaranteed price
  B. incentive and penalty
  C. cost plus fixed fee
  D. unit price

Question 2

A set of construction documents that show how the construction was actually performed are known by the name ___________________ __.
 
  A. as-built drawings
  B. presentation drawings
  C. commissioning drawings
  D. none of the above



ASDFGJLO

  • Sr. Member
  • ****
  • Posts: 335
Answer to Question 1

A

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

In most cases, kidneys can recover from almost complete loss of function, such as in acute kidney (renal) failure.

Did you know?

Cocaine was isolated in 1860 and first used as a local anesthetic in 1884. Its first clinical use was by Sigmund Freud to wean a patient from morphine addiction. The fictional character Sherlock Holmes was supposed to be addicted to cocaine by injection.

Did you know?

The shortest mature adult human of whom there is independent evidence was Gul Mohammed in India. In 1990, he was measured in New Delhi and stood 22.5 inches tall.

Did you know?

If you could remove all of your skin, it would weigh up to 5 pounds.

Did you know?

The human body produces and destroys 15 million blood cells every second.

For a complete list of videos, visit our video library