Author Question: Which of the project types listed would most frequently use a construction management arrangement? ... (Read 33 times)

nelaaney

  • Hero Member
  • *****
  • Posts: 560
Which of the project types listed would most frequently use a construction management arrangement?
 
  a. Building construction
  b. Heavy construction
  c. Industrial
  d. Residential

Question 2

Owner involvement is highest during what project phase?
 
  a. Construction
  b. Engineering and design
  c. Concept and feasibility
  d. None of the above



courtney_bruh

  • Sr. Member
  • ****
  • Posts: 308
Answer to Question 1

A

Answer to Question 2

C



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question

nelaaney

  • Hero Member
  • *****
  • Posts: 560
Both answers were spot on, thank you once again




 

Did you know?

Famous people who died from poisoning or drug overdose include, Adolf Hitler, Socrates, Juan Ponce de Leon, Marilyn Monroe, Judy Garland, and John Belushi.

Did you know?

The heart is located in the center of the chest, with part of it tipped slightly so that it taps against the left side of the chest.

Did you know?

Certain chemicals, after ingestion, can be converted by the body into cyanide. Most of these chemicals have been removed from the market, but some old nail polish remover, solvents, and plastics manufacturing solutions can contain these substances.

Did you know?

A recent study has found that following a diet rich in berries may slow down the aging process of the brain. This diet apparently helps to keep dopamine levels much higher than are seen in normal individuals who do not eat berries as a regular part of their diet as they enter their later years.

Did you know?

According to animal studies, the typical American diet is damaging to the liver and may result in allergies, low energy, digestive problems, and a lack of ability to detoxify harmful substances.

For a complete list of videos, visit our video library