Author Question: Which of the project types listed would most frequently use a construction management arrangement? ... (Read 91 times)

nelaaney

  • Hero Member
  • *****
  • Posts: 560
Which of the project types listed would most frequently use a construction management arrangement?
 
  a. Building construction
  b. Heavy construction
  c. Industrial
  d. Residential

Question 2

Owner involvement is highest during what project phase?
 
  a. Construction
  b. Engineering and design
  c. Concept and feasibility
  d. None of the above



courtney_bruh

  • Sr. Member
  • ****
  • Posts: 308
Answer to Question 1

A

Answer to Question 2

C



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question

nelaaney

  • Hero Member
  • *****
  • Posts: 560
Both answers were spot on, thank you once again




 

Did you know?

Aspirin may benefit 11 different cancers, including those of the colon, pancreas, lungs, prostate, breasts, and leukemia.

Did you know?

Nearly 31 million adults in America have a total cholesterol level that is more than 240 mg per dL.

Did you know?

Pubic lice (crabs) are usually spread through sexual contact. You cannot catch them by using a public toilet.

Did you know?

The liver is the only organ that has the ability to regenerate itself after certain types of damage. As much as 25% of the liver can be removed, and it will still regenerate back to its original shape and size. However, the liver cannot regenerate after severe damage caused by alcohol.

Did you know?

Eating food that has been cooked with poppy seeds may cause you to fail a drug screening test, because the seeds contain enough opiate alkaloids to register as a positive.

For a complete list of videos, visit our video library