Which of the project types listed would most frequently use a construction management arrangement?
 
  a. Building construction
  b. Heavy construction
  c. Industrial
  d. Residential

Question 2

Owner involvement is highest during what project phase?
 
  a. Construction
  b. Engineering and design
  c. Concept and feasibility
  d. None of the above



courtney_bruh

  • Sr. Member
  • ****
  • Posts: 308
Answer to Question 1

A

Answer to Question 2

C



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question

nelaaney

  • Hero Member
  • *****
  • Posts: 560
Both answers were spot on, thank you once again




 

Did you know?

Most strokes are caused when blood clots move to a blood vessel in the brain and block blood flow to that area. Thrombolytic therapy can be used to dissolve the clot quickly. If given within 3 hours of the first stroke symptoms, this therapy can help limit stroke damage and disability.

Did you know?

Women are 50% to 75% more likely than men to experience an adverse drug reaction.

Did you know?

The use of salicylates dates back 2,500 years to Hippocrates’s recommendation of willow bark (from which a salicylate is derived) as an aid to the pains of childbirth. However, overdosage of salicylates can harm body fluids, electrolytes, the CNS, the GI tract, the ears, the lungs, the blood, the liver, and the kidneys and cause coma or death.

Did you know?

No drugs are available to relieve parathyroid disease. Parathyroid disease is caused by a parathyroid tumor, and it needs to be removed by surgery.

Did you know?

More than 30% of American adults, and about 12% of children utilize health care approaches that were developed outside of conventional medicine.

For a complete list of videos, visit our video library