Author Question: When the owner and the construction contractor agree to a predetermined price that cannot be ... (Read 78 times)

savannahhooper

  • Hero Member
  • *****
  • Posts: 576
When the owner and the construction contractor agree to a predetermined price that cannot be exceeded for the construction work, but will both share in any savings generated by the work being completed a price that is lower than the predetermined price; the contract format is known as ___________________ ______ contract.
 
  A. maximum guaranteed price
  B. incentive and penalty
  C. cost plus fixed fee
  D. unit price

Question 2

A set of construction documents that show how the construction was actually performed are known by the name ___________________ __.
 
  A. as-built drawings
  B. presentation drawings
  C. commissioning drawings
  D. none of the above



ASDFGJLO

  • Sr. Member
  • ****
  • Posts: 335
Answer to Question 1

A

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question


 

Did you know?

Inotropic therapy does not have a role in the treatment of most heart failure patients. These drugs can make patients feel and function better but usually do not lengthen the predicted length of their lives.

Did you know?

Persons who overdose with cardiac glycosides have a better chance of overall survival if they can survive the first 24 hours after the overdose.

Did you know?

In 2010, opiate painkllers, such as morphine, OxyContin®, and Vicodin®, were tied to almost 60% of drug overdose deaths.

Did you know?

The term bacteria was devised in the 19th century by German biologist Ferdinand Cohn. He based it on the Greek word "bakterion" meaning a small rod or staff. Cohn is considered to be the father of modern bacteriology.

Did you know?

When blood is exposed to air, it clots. Heparin allows the blood to come in direct contact with air without clotting.

For a complete list of videos, visit our video library