Author Question: To construct the Gantt chart, a ________ is drawn for each activity that reflects its sequence and ... (Read 71 times)

frankwu

  • Hero Member
  • *****
  • Posts: 549
To construct the Gantt chart, a ________ is drawn for each activity that reflects its sequence and duration.
 
  A) Horizontal line
  B) Horizontal bar
  C) Vertical line
  D) Vertical bar

Question 2

When a steering committee chooses a project it is referred as a bottom-up source.
 
  Indicate whether the statement is true or false


dellikani2015

  • Sr. Member
  • ****
  • Posts: 332
Answer to Question 1

B

Answer to Question 2

FALSE



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

In the ancient and medieval periods, dysentery killed about ? of all babies before they reach 12 months of age. The disease was transferred through contaminated drinking water, because there was no way to adequately dispose of sewage, which contaminated the water.

Did you know?

According to the Migraine Research Foundation, migraines are the third most prevalent illness in the world. Women are most affected (18%), followed by children of both sexes (10%), and men (6%).

Did you know?

The top five reasons that children stay home from school are as follows: colds, stomach flu (gastroenteritis), ear infection (otitis media), pink eye (conjunctivitis), and sore throat.

Did you know?

Acetaminophen (Tylenol) in overdose can seriously damage the liver. It should never be taken by people who use alcohol heavily; it can result in severe liver damage and even a condition requiring a liver transplant.

Did you know?

People with high total cholesterol have about two times the risk for heart disease as people with ideal levels.

For a complete list of videos, visit our video library