To construct the Gantt chart, a ________ is drawn for each activity that reflects its sequence and duration.
 
  A) Horizontal line
  B) Horizontal bar
  C) Vertical line
  D) Vertical bar

Question 2

When a steering committee chooses a project it is referred as a bottom-up source.
 
  Indicate whether the statement is true or false


dellikani2015

  • Sr. Member
  • ****
  • Posts: 332
Answer to Question 1

B

Answer to Question 2

FALSE



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Elderly adults are living longer, and causes of death are shifting. At the same time, autopsy rates are at or near their lowest in history.

Did you know?

Your skin wrinkles if you stay in the bathtub a long time because the outermost layer of skin (which consists of dead keratin) swells when it absorbs water. It is tightly attached to the skin below it, so it compensates for the increased area by wrinkling. This happens to the hands and feet because they have the thickest layer of dead keratin cells.

Did you know?

Most women experience menopause in their 50s. However, in 1994, an Italian woman gave birth to a baby boy when she was 61 years old.

Did you know?

In the ancient and medieval periods, dysentery killed about ? of all babies before they reach 12 months of age. The disease was transferred through contaminated drinking water, because there was no way to adequately dispose of sewage, which contaminated the water.

Did you know?

There are more bacteria in your mouth than there are people in the world.

For a complete list of videos, visit our video library