Which of the following is the first step in materials requirements planning (MRP)?
 
 

a. Setting deadlines for production and operations
  b. Specifying materials and parts needed for production and operations
  c. Determine inventory on hand
  d. Establish ordering and delivery schedules
  e. Rotate materials and parts to insure timely usage



Question 2

Materials Requirement Planning is valuable to managers because:
 
 

a. it is easily learned by all members of an organization.
  b. it can handle different lead times effectively.
  c. it does not require the use of a computer.
  d. All of these are reasons why MRP is valuable.
  e. None of these are reasons why MRP is valuable.




Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

fromAlphatoOmega22

  • Sr. Member
  • ****
  • Posts: 345
Answer to Question 1

B

Answer to Question 2

B




cmoore54

  • Member
  • Posts: 568
Reply 2 on: Jul 21, 2018
Great answer, keep it coming :)


parker125

  • Member
  • Posts: 332
Reply 3 on: Yesterday
Thanks for the timely response, appreciate it

 

Did you know?

If all the neurons in the human body were lined up, they would stretch more than 600 miles.

Did you know?

The B-complex vitamins and vitamin C are not stored in the body and must be replaced each day.

Did you know?

Signs of depression include feeling sad most of the time for 2 weeks or longer; loss of interest in things normally enjoyed; lack of energy; sleep and appetite disturbances; weight changes; feelings of hopelessness, helplessness, or worthlessness; an inability to make decisions; and thoughts of death and suicide.

Did you know?

ACTH levels are normally highest in the early morning (between 6 and 8 A.M.) and lowest in the evening (between 6 and 11 P.M.). Therefore, a doctor who suspects abnormal levels looks for low ACTH in the morning and high ACTH in the evening.

Did you know?

Fatal fungal infections may be able to resist newer antifungal drugs. Globally, fungal infections are often fatal due to the lack of access to multiple antifungals, which may be required to be utilized in combination. Single antifungals may not be enough to stop a fungal infection from causing the death of a patient.

For a complete list of videos, visit our video library