If a subcontractor had a question or concern that could best be answered by conferring directly with the owner of the project, could he or she pick up the phone and call the owner to request a meeting? Explain.
 
  What will be an ideal response?

Question 2

Which of these drawings allows multiple sides of a proposed project to be seen in one drawing?
 
  a. elevation view c. plan view
  b. section view d. perspective view



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

yeungji

  • Sr. Member
  • ****
  • Posts: 319
Answer to Question 1

No. The subcontractor has no direct line connection to anyone other than the general contractor or whomever else he or she is in contract with. Questions for the owner would have to go through that intermediary.

Answer to Question 2

D
perspective view





 

Did you know?

Patients who have undergone chemotherapy for the treatment of cancer often complain of a lack of mental focus; memory loss; and a general diminution in abilities such as multitasking, attention span, and general mental agility.

Did you know?

Between 1999 and 2012, American adults with high total cholesterol decreased from 18.3% to 12.9%

Did you know?

In 1835 it was discovered that a disease of silkworms known as muscardine could be transferred from one silkworm to another, and was caused by a fungus.

Did you know?

Malaria was not eliminated in the United States until 1951. The term eliminated means that no new cases arise in a country for 3 years.

Did you know?

Urine turns bright yellow if larger than normal amounts of certain substances are consumed; one of these substances is asparagus.

For a complete list of videos, visit our video library