This topic contains a solution. Click here to go to the answer

Author Question: Why do air-handling units require field adjustment during the commissioning phase? A) The ... (Read 102 times)

deesands

  • Hero Member
  • *****
  • Posts: 514
Why do air-handling units require field adjustment during the commissioning phase?
 
  A) The performance requirements of the blower cannot be determined in advance.
  B) Manufacturing errors that affect blower performance are common.
  C) To match the blower performance to the system requirements
  D) Air-handling units normally do not require field adjustment.

Question 2

Draining a small fraction of circulating water from the tower sump to prevent the buildup and concentration of scale forming minerals is called:
 
  A) Sump purging. B) Draindown. C) Blowdown. D) Desalinization.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

reversalruiz

  • Sr. Member
  • ****
  • Posts: 327
Answer to Question 1

C

Answer to Question 2

C




reversalruiz

  • Sr. Member
  • ****
  • Posts: 327

 

Did you know?

This year, an estimated 1.4 million Americans will have a new or recurrent heart attack.

Did you know?

There are more sensory neurons in the tongue than in any other part of the body.

Did you know?

Side effects from substance abuse include nausea, dehydration, reduced productivitiy, and dependence. Though these effects usually worsen over time, the constant need for the substance often overcomes rational thinking.

Did you know?

Long-term mental and physical effects from substance abuse include: paranoia, psychosis, immune deficiencies, and organ damage.

Did you know?

The Centers for Disease Control and Prevention (CDC) was originally known as the Communicable Disease Center, which was formed to fight malaria. It was originally headquartered in Atlanta, Georgia, since the Southern states faced the worst threat from malaria.

For a complete list of videos, visit our video library