Design/build means that
 
  a. One company is responsible for both design and construction
  b. Construction begins before design is complete
  c. The project is technically complex
  d. Both A and B

Question 2

Which of the following is true of a GMP contract?
 
  a. GMP is the same as a lump sum bid
  b. The contractor passes all costs to the owner up to a predetermined maximum
  c. The owner assumes all project risk
  d. The construction manager assumes all project risk
  e. None of the above



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

ky860224

  • Sr. Member
  • ****
  • Posts: 350
Answer to Question 1

A

Answer to Question 2

B





 

Did you know?

It is believed that the Incas used anesthesia. Evidence supports the theory that shamans chewed cocoa leaves and drilled holes into the heads of patients (letting evil spirits escape), spitting into the wounds they made. The mixture of cocaine, saliva, and resin numbed the site enough to allow hours of drilling.

Did you know?

On average, the stomach produces 2 L of hydrochloric acid per day.

Did you know?

Drugs are in development that may cure asthma and hay fever once and for all. They target leukotrienes, which are known to cause tightening of the air passages in the lungs and increase mucus productions in nasal passages.

Did you know?

Multiple sclerosis is a condition wherein the body's nervous system is weakened by an autoimmune reaction that attacks the myelin sheaths of neurons.

Did you know?

It is believed that humans initially contracted crabs from gorillas about 3 million years ago from either sleeping in gorilla nests or eating the apes.

For a complete list of videos, visit our video library