This topic contains a solution. Click here to go to the answer

Author Question: Design/build means that a. One company is responsible for both design and construction b. ... (Read 109 times)

jilianpiloj

  • Hero Member
  • *****
  • Posts: 521
Design/build means that
 
  a. One company is responsible for both design and construction
  b. Construction begins before design is complete
  c. The project is technically complex
  d. Both A and B

Question 2

Which of the following is true of a GMP contract?
 
  a. GMP is the same as a lump sum bid
  b. The contractor passes all costs to the owner up to a predetermined maximum
  c. The owner assumes all project risk
  d. The construction manager assumes all project risk
  e. None of the above



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

ky860224

  • Sr. Member
  • ****
  • Posts: 350
Answer to Question 1

A

Answer to Question 2

B





 

Did you know?

Multiple sclerosis is a condition wherein the body's nervous system is weakened by an autoimmune reaction that attacks the myelin sheaths of neurons.

Did you know?

Many supplement containers do not even contain what their labels say. There are many documented reports of products containing much less, or more, that what is listed on their labels. They may also contain undisclosed prescription drugs and even contaminants.

Did you know?

Women are 50% to 75% more likely than men to experience an adverse drug reaction.

Did you know?

Thyroid conditions may make getting pregnant impossible.

Did you know?

The newest statin drug, rosuvastatin, has been called a superstatin because it appears to reduce LDL cholesterol to a greater degree than the other approved statin drugs.

For a complete list of videos, visit our video library