Author Question: _______________________ is/are great way(s) to uncover important aspects of a project . A. SWOT ... (Read 113 times)

nmorano1

  • Hero Member
  • *****
  • Posts: 598
___________________ ____ is/are great way(s) to uncover important aspects of a project .
 
  A. SWOT Analysis
  B. Brainstorming
  C. Mind Maps
  D. Both B and C

Question 2

What types of projects tend to be scheduled in terms of working days? Why?
 
  What will be an ideal response?



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

bubulittle310@msn.cn

  • Sr. Member
  • ****
  • Posts: 281
Answer to Question 1

D

Answer to Question 2

Projects that are most susceptible to the elements (namely the weather) tend to
be scheduled in terms of working days. Examples would generally include the
construction of engineering projects (those specifically including the services of an
engineer but not an architect) such as highways, bridges, dams, airport runways, canals,
and utility installations. The specific durations of projects conducted in the elements are
difficult to quantify in calendar days. Rainfall at the very beginning of a project can stall
the entire work effort. In fact, large amounts of rainfall at any time during the
construction of engineering projects will generally have a significant impact on the
construction effort. This problem can be best addressed by defining construction duration
in terms of working days. This is regarded as the most equitable way to define duration
when weather can hamper progress. The use of working days permits the duration to be
defined in terms that are fair to the contractor. If calendar days were used to define
duration on such projects, the owner would be faced with numerous requests for time
extensions. Requesting time extensions can be adversarial and this would occur far too
often on engineering projects defined in calendar days.

On the other hand, building projects are generally only severely impacted by adverse
weather in the early stages of construction. In some regions of the country, building
projects are begun in the spring months when weather conditions are most conducive to
construction work. Once a building is dried in, the elements can still compromise the
work effort, but progress can generally still be made.




nmorano1

  • Member
  • Posts: 598
Reply 2 on: Jul 26, 2018
:D TYSM


miss.ashley

  • Member
  • Posts: 371
Reply 3 on: Yesterday
Thanks for the timely response, appreciate it

 

Did you know?

Methicillin-resistant Staphylococcus aureus or MRSA was discovered in 1961 in the United Kingdom. It if often referred to as a superbug. MRSA infections cause more deaths in the United States every year than AIDS.

Methicilli ...
Did you know?

Alcohol acts as a diuretic. Eight ounces of water is needed to metabolize just 1 ounce of alcohol.

Did you know?

Anesthesia awareness is a potentially disturbing adverse effect wherein patients who have been paralyzed with muscle relaxants may awaken. They may be aware of their surroundings but unable to communicate or move. Neurologic monitoring equipment that helps to more closely check the patient's anesthesia stages is now available to avoid the occurrence of anesthesia awareness.

Did you know?

Fatal fungal infections may be able to resist newer antifungal drugs. Globally, fungal infections are often fatal due to the lack of access to multiple antifungals, which may be required to be utilized in combination. Single antifungals may not be enough to stop a fungal infection from causing the death of a patient.

Did you know?

Pregnant women usually experience a heightened sense of smell beginning late in the first trimester. Some experts call this the body's way of protecting a pregnant woman from foods that are unsafe for the fetus.

For a complete list of videos, visit our video library