Author Question: _______________________ is/are great way(s) to uncover important aspects of a project . A. SWOT ... (Read 21 times)

nmorano1

  • Hero Member
  • *****
  • Posts: 598
___________________ ____ is/are great way(s) to uncover important aspects of a project .
 
  A. SWOT Analysis
  B. Brainstorming
  C. Mind Maps
  D. Both B and C

Question 2

What types of projects tend to be scheduled in terms of working days? Why?
 
  What will be an ideal response?



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

bubulittle310@msn.cn

  • Sr. Member
  • ****
  • Posts: 281
Answer to Question 1

D

Answer to Question 2

Projects that are most susceptible to the elements (namely the weather) tend to
be scheduled in terms of working days. Examples would generally include the
construction of engineering projects (those specifically including the services of an
engineer but not an architect) such as highways, bridges, dams, airport runways, canals,
and utility installations. The specific durations of projects conducted in the elements are
difficult to quantify in calendar days. Rainfall at the very beginning of a project can stall
the entire work effort. In fact, large amounts of rainfall at any time during the
construction of engineering projects will generally have a significant impact on the
construction effort. This problem can be best addressed by defining construction duration
in terms of working days. This is regarded as the most equitable way to define duration
when weather can hamper progress. The use of working days permits the duration to be
defined in terms that are fair to the contractor. If calendar days were used to define
duration on such projects, the owner would be faced with numerous requests for time
extensions. Requesting time extensions can be adversarial and this would occur far too
often on engineering projects defined in calendar days.

On the other hand, building projects are generally only severely impacted by adverse
weather in the early stages of construction. In some regions of the country, building
projects are begun in the spring months when weather conditions are most conducive to
construction work. Once a building is dried in, the elements can still compromise the
work effort, but progress can generally still be made.




nmorano1

  • Member
  • Posts: 598
Reply 2 on: Jul 26, 2018
Wow, this really help


pratush dev

  • Member
  • Posts: 321
Reply 3 on: Yesterday
:D TYSM

 

Did you know?

All adverse reactions are commonly charted in red ink in the patient's record and usually are noted on the front of the chart. Failure to follow correct documentation procedures may result in malpractice lawsuits.

Did you know?

Increased intake of vitamin D has been shown to reduce fractures up to 25% in older people.

Did you know?

Historic treatments for rheumatoid arthritis have included gold salts, acupuncture, a diet consisting of apples or rhubarb, nutmeg, nettles, bee venom, bracelets made of copper, prayer, rest, tooth extractions, fasting, honey, vitamins, insulin, snow collected on Christmas, magnets, and electric convulsion therapy.

Did you know?

For pediatric patients, intravenous fluids are the most commonly cited products involved in medication errors that are reported to the USP.

Did you know?

After a vasectomy, it takes about 12 ejaculations to clear out sperm that were already beyond the blocked area.

For a complete list of videos, visit our video library