Author Question: What is required in order for a contractor to protect himself or herself when a constructive change ... (Read 35 times)

big1devin

  • Hero Member
  • *****
  • Posts: 583
What is required in order for a contractor to protect himself or herself when a constructive change occurs on a project?
 
  What will be an ideal response?

Question 2

A resident project representative should:
 
  A. allocate areas for construction shacks for the sub-contractors.
   B. set the starting and stopping times of the job.
   C. supervise the activities of the inspection on the project.
   D. keep tabs on the general contractor to insure that he or she is within the project budget.
   E. supervise the construction work on the project.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

alvinum

  • Sr. Member
  • ****
  • Posts: 317
Answer to Question 1

In order for a contractor to protect himself or herself when a constructive change occurs on a project, and the engineer refuses to issue a change order, the contractor should notify the engineer that he or she intends to file a claim to be compensated for what they interpret to be additional work. In this situation, the contractor is claiming that a constructive change occurred and that a change order should have been issued for the work. The contractor will still perform the work but a claim will be filed for additional compensation that will be reviewed during negotiations, arbitration, or litigation depending on which dispute resolution method is used for a project.

Answer to Question 2

C




big1devin

  • Member
  • Posts: 583
Reply 2 on: Jul 26, 2018
Thanks for the timely response, appreciate it


Missbam101

  • Member
  • Posts: 341
Reply 3 on: Yesterday
Great answer, keep it coming :)

 

Did you know?

Medication errors are three times higher among children and infants than with adults.

Did you know?

In the United States, there is a birth every 8 seconds, according to the U.S. Census Bureau's Population Clock.

Did you know?

ACTH levels are normally highest in the early morning (between 6 and 8 A.M.) and lowest in the evening (between 6 and 11 P.M.). Therefore, a doctor who suspects abnormal levels looks for low ACTH in the morning and high ACTH in the evening.

Did you know?

The National Institutes of Health have supported research into acupuncture. This has shown that acupuncture significantly reduced pain associated with osteoarthritis of the knee, when used as a complement to conventional therapies.

Did you know?

As many as 20% of Americans have been infected by the fungus known as Histoplasmosis. While most people are asymptomatic or only have slight symptoms, infection can progress to a rapid and potentially fatal superinfection.

For a complete list of videos, visit our video library