This topic contains a solution. Click here to go to the answer

Author Question: What is required in order for a contractor to protect himself or herself when a constructive change ... (Read 41 times)

big1devin

  • Hero Member
  • *****
  • Posts: 583
What is required in order for a contractor to protect himself or herself when a constructive change occurs on a project?
 
  What will be an ideal response?

Question 2

A resident project representative should:
 
  A. allocate areas for construction shacks for the sub-contractors.
   B. set the starting and stopping times of the job.
   C. supervise the activities of the inspection on the project.
   D. keep tabs on the general contractor to insure that he or she is within the project budget.
   E. supervise the construction work on the project.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

alvinum

  • Sr. Member
  • ****
  • Posts: 317
Answer to Question 1

In order for a contractor to protect himself or herself when a constructive change occurs on a project, and the engineer refuses to issue a change order, the contractor should notify the engineer that he or she intends to file a claim to be compensated for what they interpret to be additional work. In this situation, the contractor is claiming that a constructive change occurred and that a change order should have been issued for the work. The contractor will still perform the work but a claim will be filed for additional compensation that will be reviewed during negotiations, arbitration, or litigation depending on which dispute resolution method is used for a project.

Answer to Question 2

C




big1devin

  • Member
  • Posts: 583
Reply 2 on: Jul 26, 2018
Wow, this really help


connor417

  • Member
  • Posts: 329
Reply 3 on: Yesterday
:D TYSM

 

Did you know?

Eating carrots will improve your eyesight. Carrots are high in vitamin A (retinol), which is essential for good vision. It can also be found in milk, cheese, egg yolks, and liver.

Did you know?

The Centers for Disease Control and Prevention (CDC) was originally known as the Communicable Disease Center, which was formed to fight malaria. It was originally headquartered in Atlanta, Georgia, since the Southern states faced the worst threat from malaria.

Did you know?

Studies show that systolic blood pressure can be significantly lowered by taking statins. In fact, the higher the patient's baseline blood pressure, the greater the effect of statins on his or her blood pressure.

Did you know?

ACTH levels are normally highest in the early morning (between 6 and 8 A.M.) and lowest in the evening (between 6 and 11 P.M.). Therefore, a doctor who suspects abnormal levels looks for low ACTH in the morning and high ACTH in the evening.

Did you know?

Certain chemicals, after ingestion, can be converted by the body into cyanide. Most of these chemicals have been removed from the market, but some old nail polish remover, solvents, and plastics manufacturing solutions can contain these substances.

For a complete list of videos, visit our video library