Author Question: The critical path in a PERT diagram is the one that: A) has the most activities on it. B) has ... (Read 136 times)

altibaby

  • Hero Member
  • *****
  • Posts: 562
The critical path in a PERT diagram is the one that:
 
  A) has the most activities on it.
 
  B) has activities that can be delayed and not impact the completion date of the project.
 
  C) takes the longest amount of time.
 
  D) is the most likely to occur.

Question 2

A recipe for 100 servings contains 25 pounds of ground beef, 10 pounds of pasta, 10 pounds of tomato paste, and 5 pounds of cheese. You are adjusting this recipe using the factor method and have determined your conversion factor is 5.
 
  How many pounds of ground beef will be in your new recipe?
 
  A) 12.5 pounds
 
  B) 125 pounds
 
  C) 5 pounds
 
  D) Unable to calculate because desired number of servings is not given for the adjusted recipe.


Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

duke02

  • Sr. Member
  • ****
  • Posts: 312
Lorsum iprem. Lorsus sur ipci. Lorsem sur iprem. Lorsum sur ipdi, lorsem sur ipci. Lorsum sur iprium, valum sur ipci et, vala sur ipci. Lorsem sur ipci, lorsa sur iprem. Valus sur ipdi. Lorsus sur iprium nunc, valem sur iprium. Valem sur ipdi. Lorsa sur iprium. Lorsum sur iprium. Valem sur ipdi. Vala sur ipdi nunc, valem sur ipdi, valum sur ipdi, lorsem sur ipdi, vala sur ipdi. Valem sur iprem nunc, lorsa sur iprium. Valum sur ipdi et, lorsus sur ipci. Valem sur iprem. Valem sur ipci. Lorsa sur iprium. Lorsem sur ipci, valus sur iprem. Lorsem sur iprem nunc, valus sur iprium.
Answer Preview
Only 29% of students answer this correctly




altibaby

  • Member
  • Posts: 562
Reply 2 on: Aug 2, 2018
Wow, this really help


ktidd

  • Member
  • Posts: 319
Reply 3 on: Yesterday
Excellent

 

Did you know?

There can actually be a 25-hour time difference between certain locations in the world. The International Date Line passes between the islands of Samoa and American Samoa. It is not a straight line, but "zig-zags" around various island chains. Therefore, Samoa and nearby islands have one date, while American Samoa and nearby islands are one day behind. Daylight saving time is used in some islands, but not in others—further shifting the hours out of sync with natural time.

Did you know?

The liver is the only organ that has the ability to regenerate itself after certain types of damage. As much as 25% of the liver can be removed, and it will still regenerate back to its original shape and size. However, the liver cannot regenerate after severe damage caused by alcohol.

Did you know?

Amphetamine poisoning can cause intravascular coagulation, circulatory collapse, rhabdomyolysis, ischemic colitis, acute psychosis, hyperthermia, respiratory distress syndrome, and pericarditis.

Did you know?

Certain rare plants containing cyanide include apricot pits and a type of potato called cassava. Fortunately, only chronic or massive ingestion of any of these plants can lead to serious poisoning.

Did you know?

It is important to read food labels and choose foods with low cholesterol and saturated trans fat. You should limit saturated fat to no higher than 6% of daily calories.

For a complete list of videos, visit our video library