Author Question: The longest path through a PERT diagram is referred to as the ________ path. A) critical B) ... (Read 88 times)

jace

  • Hero Member
  • *****
  • Posts: 541
The longest path through a PERT diagram is referred to as the ________ path.
 
  A) critical
  B) hardest
  C) fastest
  D) slowest

Question 2

A BPM process category is people-intensive processes.
 
  Indicate whether the statement is true or false



Briannahope

  • Sr. Member
  • ****
  • Posts: 364
Answer to Question 1

A

Answer to Question 2

TRUE



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The liver is the only organ that has the ability to regenerate itself after certain types of damage. As much as 25% of the liver can be removed, and it will still regenerate back to its original shape and size. However, the liver cannot regenerate after severe damage caused by alcohol.

Did you know?

Asthma occurs in one in 11 children and in one in 12 adults. African Americans and Latinos have a higher risk for developing asthma than other groups.

Did you know?

The U.S. Pharmacopeia Medication Errors Reporting Program states that approximately 50% of all medication errors involve insulin.

Did you know?

According to the CDC, approximately 31.7% of the U.S. population has high low-density lipoprotein (LDL) or "bad cholesterol" levels.

Did you know?

The first-known contraceptive was crocodile dung, used in Egypt in 2000 BC. Condoms were also reportedly used, made of animal bladders or intestines.

For a complete list of videos, visit our video library