Author Question: The longest path through a PERT diagram is referred to as the ________ path. A) critical B) ... (Read 128 times)

jace

  • Hero Member
  • *****
  • Posts: 541
The longest path through a PERT diagram is referred to as the ________ path.
 
  A) critical
  B) hardest
  C) fastest
  D) slowest

Question 2

A BPM process category is people-intensive processes.
 
  Indicate whether the statement is true or false



Briannahope

  • Sr. Member
  • ****
  • Posts: 364
Answer to Question 1

A

Answer to Question 2

TRUE



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The average office desk has 400 times more bacteria on it than a toilet.

Did you know?

All adults should have their cholesterol levels checked once every 5 years. During 2009–2010, 69.4% of Americans age 20 and older reported having their cholesterol checked within the last five years.

Did you know?

Nitroglycerin is used to alleviate various heart-related conditions, and it is also the chief component of dynamite (but mixed in a solid clay base to stabilize it).

Did you know?

Patients should never assume they are being given the appropriate drugs. They should make sure they know which drugs are being prescribed, and always double-check that the drugs received match the prescription.

Did you know?

The liver is the only organ that has the ability to regenerate itself after certain types of damage. As much as 25% of the liver can be removed, and it will still regenerate back to its original shape and size. However, the liver cannot regenerate after severe damage caused by alcohol.

For a complete list of videos, visit our video library