Author Question: The longest path through a PERT diagram is referred to as the ________ path. A) critical B) ... (Read 127 times)

jace

  • Hero Member
  • *****
  • Posts: 541
The longest path through a PERT diagram is referred to as the ________ path.
 
  A) critical
  B) hardest
  C) fastest
  D) slowest

Question 2

A BPM process category is people-intensive processes.
 
  Indicate whether the statement is true or false



Briannahope

  • Sr. Member
  • ****
  • Posts: 364
Answer to Question 1

A

Answer to Question 2

TRUE



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Signs and symptoms of a drug overdose include losing consciousness, fever or sweating, breathing problems, abnormal pulse, and changes in skin color.

Did you know?

Before a vaccine is licensed in the USA, the Food and Drug Administration (FDA) reviews it for safety and effectiveness. The CDC then reviews all studies again, as well as the American Academy of Pediatrics and the American Academy of Family Physicians. Every lot of vaccine is tested before administration to the public, and the FDA regularly inspects vaccine manufacturers' facilities.

Did you know?

Anti-aging claims should not ever be believed. There is no supplement, medication, or any other substance that has been proven to slow or stop the aging process.

Did you know?

Though the United States has largely rejected the metric system, it is used for currency, as in 100 pennies = 1 dollar. Previously, the British currency system was used, with measurements such as 12 pence to the shilling, and 20 shillings to the pound.

Did you know?

During the twentieth century, a variant of the metric system was used in Russia and France in which the base unit of mass was the tonne. Instead of kilograms, this system used millitonnes (mt).

For a complete list of videos, visit our video library