This topic contains a solution. Click here to go to the answer

Author Question: A performance plan for improvement should include: 1. a time frame for achieving each goal. 2. ... (Read 106 times)

FButt

  • Hero Member
  • *****
  • Posts: 519
A performance plan for improvement should include:
 
  1.
  a time frame for achieving each goal.
  2.
  behavioral characteristics.
  3.
  personality characteristics.
  4.
  a job description.

Question 2

Performance review is based on:
 
  1.
  past reviews of the employee.
  2.
  how the manager views the job.
  3.
  a review of job standards.
  4.
  the job description.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

ebe

  • Sr. Member
  • ****
  • Posts: 320
Answer to Question 1

ANS: 1
A reasonable time frame should be established, which the employee should know.

Answer to Question 2

ANS: 4
The performance review should be based on the employee's job description. The review is designed to help the employee do a better job, so the manager should be aware of the job requirements.




FButt

  • Member
  • Posts: 519
Reply 2 on: Jul 17, 2018
Wow, this really help


tkempin

  • Member
  • Posts: 332
Reply 3 on: Yesterday
:D TYSM

 

Did you know?

The toxic levels for lithium carbonate are close to the therapeutic levels. Signs of toxicity include fine hand tremor, polyuria, mild thirst, nausea, general discomfort, diarrhea, vomiting, drowsiness, muscular weakness, lack of coordination, ataxia, giddiness, tinnitus, and blurred vision.

Did you know?

The first documented use of surgical anesthesia in the United States was in Connecticut in 1844.

Did you know?

The ratio of hydrogen atoms to oxygen in water (H2O) is 2:1.

Did you know?

To maintain good kidney function, you should drink at least 3 quarts of water daily. Water dilutes urine and helps prevent concentrations of salts and minerals that can lead to kidney stone formation. Chronic dehydration is a major contributor to the development of kidney stones.

Did you know?

Human neurons are so small that they require a microscope in order to be seen. However, some neurons can be up to 3 feet long, such as those that extend from the spinal cord to the toes.

For a complete list of videos, visit our video library