Actual measurements for construction are taken from the _____.
 
  a. primary control points
  b. secondary control points
  c. subsidiary control points
  d. working control points

Question 2

The location and levelness of concrete forms are established by using _____.
 
  a. azimuth stakes
  b. control centers
  c. elevation posts
  d. control points



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

ryrychapman11

  • Sr. Member
  • ****
  • Posts: 334
Answer to Question 1

d

Answer to Question 2

d




ryrychapman11

  • Sr. Member
  • ****
  • Posts: 334

 

Did you know?

The heart is located in the center of the chest, with part of it tipped slightly so that it taps against the left side of the chest.

Did you know?

The top five reasons that children stay home from school are as follows: colds, stomach flu (gastroenteritis), ear infection (otitis media), pink eye (conjunctivitis), and sore throat.

Did you know?

More than 2,500 barbiturates have been synthesized. At the height of their popularity, about 50 were marketed for human use.

Did you know?

If all the neurons in the human body were lined up, they would stretch more than 600 miles.

Did you know?

There are 20 feet of blood vessels in each square inch of human skin.

For a complete list of videos, visit our video library