Author Question: With regards to constructing a service blueprint, the time required to perform one activity at one ... (Read 72 times)

CQXA

  • Hero Member
  • *****
  • Posts: 546
With regards to constructing a service blueprint, the time required to perform one activity at one station is called:
 A) process time.
  B) activity time.
  C) maximum output per hour.
  D) operation time.
  E) bottleneck time.

Question 2

Profit would be an example of a(n) __________.
 A) mission statement
  B) strategy
  C) goal or objective
  D) strength
  E) operating philosophy



nhea

  • Sr. Member
  • ****
  • Posts: 305
Answer to Question 1

B

Answer to Question 2

C



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Aspirin may benefit 11 different cancers, including those of the colon, pancreas, lungs, prostate, breasts, and leukemia.

Did you know?

One way to reduce acid reflux is to lose two or three pounds. Most people lose weight in the belly area first when they increase exercise, meaning that heartburn can be reduced quickly by this method.

Did you know?

People often find it difficult to accept the idea that bacteria can be beneficial and improve health. Lactic acid bacteria are good, and when eaten, these bacteria improve health and increase longevity. These bacteria included in foods such as yogurt.

Did you know?

A good example of polar molecules can be understood when trying to make a cake. If water and oil are required, they will not mix together. If you put them into a measuring cup, the oil will rise to the top while the water remains on the bottom.

Did you know?

The FDA recognizes 118 routes of administration.

For a complete list of videos, visit our video library