Author Question: With regards to constructing a service blueprint, the time required to perform one activity at one ... (Read 53 times)

CQXA

  • Hero Member
  • *****
  • Posts: 546
With regards to constructing a service blueprint, the time required to perform one activity at one station is called:
 A) process time.
  B) activity time.
  C) maximum output per hour.
  D) operation time.
  E) bottleneck time.

Question 2

Profit would be an example of a(n) __________.
 A) mission statement
  B) strategy
  C) goal or objective
  D) strength
  E) operating philosophy



nhea

  • Sr. Member
  • ****
  • Posts: 305
Answer to Question 1

B

Answer to Question 2

C



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

About 80% of major fungal systemic infections are due to Candida albicans. Another form, Candida peritonitis, occurs most often in postoperative patients. A rare disease, Candida meningitis, may follow leukemia, kidney transplant, other immunosuppressed factors, or when suffering from Candida septicemia.

Did you know?

All patients with hyperparathyroidism will develop osteoporosis. The parathyroid glands maintain blood calcium within the normal range. All patients with this disease will continue to lose calcium from their bones every day, and there is no way to prevent the development of osteoporosis as a result.

Did you know?

Green tea is able to stop the scent of garlic or onion from causing bad breath.

Did you know?

There are more bacteria in your mouth than there are people in the world.

Did you know?

Many people have small pouches in their colons that bulge outward through weak spots. Each pouch is called a diverticulum. About 10% of Americans older than age 40 years have diverticulosis, which, when the pouches become infected or inflamed, is called diverticulitis. The main cause of diverticular disease is a low-fiber diet.

For a complete list of videos, visit our video library