Author Question: With regards to constructing a service blueprint, the time required to perform one activity at one ... (Read 126 times)

CQXA

  • Hero Member
  • *****
  • Posts: 546
With regards to constructing a service blueprint, the time required to perform one activity at one station is called:
 A) process time.
  B) activity time.
  C) maximum output per hour.
  D) operation time.
  E) bottleneck time.

Question 2

Profit would be an example of a(n) __________.
 A) mission statement
  B) strategy
  C) goal or objective
  D) strength
  E) operating philosophy



nhea

  • Sr. Member
  • ****
  • Posts: 305
Answer to Question 1

B

Answer to Question 2

C



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

According to animal studies, the typical American diet is damaging to the liver and may result in allergies, low energy, digestive problems, and a lack of ability to detoxify harmful substances.

Did you know?

Vampire bats have a natural anticoagulant in their saliva that permits continuous bleeding after they painlessly open a wound with their incisors. This capillary blood does not cause any significant blood loss to their victims.

Did you know?

Limit intake of red meat and dairy products made with whole milk. Choose skim milk, low-fat or fat-free dairy products. Limit fried food. Use healthy oils when cooking.

Did you know?

Allergies play a major part in the health of children. The most prevalent childhood allergies are milk, egg, soy, wheat, peanuts, tree nuts, and seafood.

Did you know?

In the United States, congenital cytomegalovirus causes one child to become disabled almost every hour. CMV is the leading preventable viral cause of development disability in newborns. These disabilities include hearing or vision loss, and cerebral palsy.

For a complete list of videos, visit our video library